PATH Cost-Effective Quick Start
PATH Cost-Effective (PATH-CE) finds the least-cost combination of post-fire mulch treatments that meets your sediment targets, and shows you which hillslopes to treat on an interactive map.
What This Is For
After a wildfire, mulching reduces erosion — but budgets are finite and not every hillslope needs the same treatment (or any treatment). PATH-CE answers the question: which hillslopes should be mulched, and at what rate, to meet my sediment goals for the least money?
It works from Omni treatment scenarios you have already run — mulching at ½, 1, and 2 tons per acre — and compares each against the post-fire baseline. An optimization then assigns at most one treatment per hillslope so that:
- every hillslope above your sediment-yield limit is treated down below it where possible, and
- average-annual sediment discharge at the watershed outlet is brought down to your target,
at the lowest total treatment cost. You get a summary of the selected plan, an interactive report (treatment map, threshold sliders, and a cost surface showing how price responds to your targets), and downloadable tables.
When to Use It
- You have a burned-area run (SBS map) and are weighing mulch treatment options and budgets.
- You need a defensible, repeatable way to prioritize hillslopes for treatment rather than treating everything or guessing.
- You want to see how treatment cost changes as sediment targets are tightened or relaxed before committing to one plan.
PATH-CE currently optimizes mulching only. If you are comparing other practices (thinning, prescribed fire), run them as Omni scenarios and compare their outputs directly.
Before You Begin
PATH-CE never creates Omni scenarios for you. It checks that the pieces below exist before solving and tells you exactly what is missing, but you must provision them first.
You need a completed WEPPcloud run with:
-
A fire scenario. A disturbed-land configuration with an SBS (soil burn severity) map uploaded, the watershed built, and WEPP run.
-
Omni scenarios. In the Omni Scenario Builder, add:
- an Undisturbed scenario, and
- a Mulching scenario for each application rate you want PATH-CE to consider, with Base scenario set to SBS Map. The ground-cover options correspond to the treatment rates: 15% ≈ ½ tons/acre, 30% ≈ 1 ton/acre, 60% ≈ 2 tons/acre.
Then click Run Omni and wait for it to finish.
-
Omni contrasts. In the Omni Contrasts Runner, run contrasts so each mulching scenario is compared against the SBS Map baseline. PATH-CE builds its outlet sediment numbers from these comparisons, so they are required — not optional.
If you configure a treatment in PATH-CE that has no matching Omni scenario or contrast, the run stops with a message naming what to provision.
Key Terms
- Sediment yield (Sdyd) — the average-annual sediment leaving an individual hillslope, expressed per acre (metric tonnes per acre per year). A hillslope-scale number.
- Sediment discharge (Sddc) — the average-annual sediment passing the watershed outlet (metric tonnes per year). A watershed-scale number.
- Treatment — one mulching intensity (½, 1, or 2 tons/acre), backed by an Omni scenario. PATH-CE assigns at most one treatment per hillslope.
- Untreatable — a hillslope that stays above the yield limit under every configured treatment, or whose yield increases under every treatment. These are reported separately rather than assigned a treatment.
All sediment quantities come from the WEPP/Omni model chain — they are model estimates, not measurements.
Settings
| Setting | What it means | Units | Why it matters |
|---|---|---|---|
| Outlet Sediment Discharge Threshold | The most average-annual sediment you will accept at the watershed outlet after treatment | tonnes/yr (display follows your unit preference) | The main watershed-scale target. Lower values demand more treatment. A value at or above the post-fire discharge removes this requirement entirely; a value of 0 asks for the maximum achievable reduction. |
| Hillslope Sediment Yield Threshold | The per-hillslope yield ceiling; hillslopes above it must be treated | tonnes/acre | Controls which hillslopes are forced into the plan. Lower values pull more hillslopes in and raise cost. Default is 15. |
| Slope ≥ / Slope ≤ | Restrict candidate hillslopes by average slope | degrees | Use when treatment is only practical (or only planned) on certain terrain. Leave blank to consider all hillslopes. |
| Burn Severities | Restrict candidate hillslopes by burn severity class | High / Moderate / Low | Use to target treatment at, for example, only high and moderate severity ground. Leave empty to include all. |
| Treatments table | Which mulch rates are available and what they cost | unit cost in $/acre; fixed cost in $ | Costs drive the optimization. The label and rate are set by the chosen Omni scenario; you edit the costs. |
Cost notes: per-hillslope cost is area × unit cost × rate, plus a one-time fixed cost (mobilization, staging) charged once per treatment type used anywhere in the plan. The default unit cost ($2,475/acre for all rates) and fixed costs ($500 / $1,000 / $1,500) are placeholders — replace them with local quotes before treating the dollar figures as meaningful.
Steps
- On your run page, enable the Path CE mod. The PATH Cost-Effective panel appears on the run page.
- Read the Omni Preconditions section of the panel and confirm you have provisioned the Omni scenarios and contrasts described above.
- Set the Outlet Sediment Discharge Threshold. To pick a realistic value, open the Omni Scenarios report and note the post-fire (SBS Map) outlet discharge — your target should normally sit below it. Leaving it at 0 asks for the maximum achievable reduction (see Interpreting Results).
- Set the Hillslope Sediment Yield Threshold, or keep the default of 15 tonnes/acre.
- Optional: restrict candidates with the slope and burn-severity filters.
- In the Treatments table, keep the rates you provisioned in Omni and remove any you did not. Enter your unit and fixed costs. Use Add Treatment to bring back a removed rate.
- Click Run PATH Cost-Effective. Your settings are saved as part of the run — there is no separate save step.
- Watch the status panel. A run validates preconditions, prepares data, solves, sweeps nearby thresholds (for the report's sliders), and renders the report. The first run takes the longest; repeat runs reuse the sweep when only sub-integer threshold changes were made.
- When the run completes, review the summary and open the resources in the Run Results panel.
Interpreting Results
Solution is the first thing to check:
- Optimal — your thresholds are achievable, and the plan shown is the least-cost way to meet them.
- Second-best (thresholds infeasible) — no combination of the configured treatments can meet your targets. PATH-CE instead reports the plan that maximizes outlet-discharge reduction under the same per-hillslope rules. This is expected when the outlet threshold is 0 or set very low. If you wanted a least-cost plan, raise one or both thresholds and rerun.
Other summary fields:
| Output | What it represents | How to read it |
|---|---|---|
| Selected Hillslopes | Number of hillslopes assigned a treatment | The size of the plan. The map in the report shows where they are. |
| Total Cost / Total Fixed Cost | Variable (area-based) and one-time costs in $ | Only as reliable as the costs you entered. |
| Total Sddc Reduction | Combined outlet-discharge reduction from the selected treatments (tonnes/yr) | How much the plan improves the outlet. |
| Final Sddc | Modeled outlet discharge after treatment (tonnes/yr) | Compare against your threshold and the post-fire value. |
| Untreatable | Hillslopes no configured treatment can fix | These stay above the yield limit regardless of budget. Consider whether other practices apply there. |
The Run Results panel links the interactive report and CSV downloads (selection, per-hillslope final yields, untreatable hillslopes, and the full threshold sweep). In the report, the sliders and cost surface re-solve at whole-number threshold combinations so you can explore cost sensitivity; your exact configured run is marked distinctly, and its numbers match the summary.
Assumptions and Limits
- All sediment values are model estimates from the WEPP/Omni chain. They are most useful for comparing options and prioritizing; absolute values carry the uncertainty of the underlying model chain. Field review is still needed before implementation.
- Only mulch treatments are optimized, and only the rates you provisioned in Omni.
- Sediment quantities are metric tonnes throughout, including where treatment rates are labeled "tons/acre" (the label reflects mulch application convention). The hillslope yield unit is metric tonnes per acre.
- Untreatable hillslopes are excluded from the plan by design, even where treating them would help the outlet. They are surfaced in the report instead.
- On runs whose Omni contrasts were built in grouped mode, burn severity is assigned per group from its dominant land cover, and a group dominated by unburned ground may have no severity at all — the burn-severity filter is most meaningful on per-hillslope contrast runs.
- The report's sliders explore whole-number thresholds only; your configured run uses your exact values.
Troubleshooting
- "Omni scenario summaries are missing treatment scenario(s) …" — a treatment in your table has no matching Omni scenario. Add the Mulching scenario (base scenario: SBS Map) and click Run Omni, or remove that treatment row.
- "… no completed 'sbs_map'-control contrasts …" — the Omni contrasts for that treatment have not been run. Open the Omni Contrasts Runner and run contrasts against the SBS Map control.
- Messages about missing watershed files — the watershed has not been built (or was rebuilt without its outputs). Rerun the watershed steps, then rerun Omni.
- "A PATH Cost-Effective run is already in progress" — wait for the current job to finish; each run replaces the previous results.
- "Report not rendered: subcatchments.WGS.geojson not found" — the run's map export files are missing, so the report was skipped. The optimization results and CSVs are still valid.
- Every run says Second-best — your thresholds are stricter than any treatment combination can satisfy. Raise the outlet threshold toward the post-fire discharge, raise the yield threshold, or add higher mulch rates in Omni.