ADR-0120: Bounded generated-road hydraulic sensitivity

Status: Accepted for research execution only; production parameterization unaccepted

Date: 2026-10-31

Context

After native revision-3 repairs, the generated Roads candidate passes all 840 physical checks but fails the magnitude acceptance gate. Whole legacy-soil controls recover most misses; switching generated soils to daily mode does not transfer that success and regresses controls. Initialized hydraulic states show that the experimental road conductivity cap retains source-soil pore/storage properties. Neither the shared soil writer nor the 200 mm break is defective on this evidence.

Decision

Permit a predeclared, incremental road-only pore/conductivity sensitivity in the research harness. Require separate component lanes, exact input readbacks, initialized-state observation, native physical audits and passing controls. Do not promote these coefficients as physical road defaults or change general SSURGO/Disturbed behavior. Keep source material, deeper horizons and restrictions.

Decision Provenance

Decision Venue: user/Codex workspace conversation, 2026-10-31, America/Los_Angeles; exact message time not retained.

Participants Present: requesting user and Codex.

Decision Owner(s): requesting user authorized autonomous Roads scientific exploration and the next hydraulic audit. Codex selected this bounded research contrast under that authority; the user did not specifically approve its coefficients or any production rule.

Implementer(s): Codex.

Change Summary

The baseline is the existing generated erosion_road_cap research candidate. Only road horizons ending at or above 200 mm are eligible. Three lanes:

  • Pore: bd0 = min(2, max(0.8, source_bd)), phi0 = 1 - bd0/2.65, bd1 = bd0 + 2.65*0.02; scale input FC/WP by (phi0-0.02)/phi0.
  • Conductivity: divide the existing capped road K by 2.4.
  • Coupled: apply both treatments.

The native density input clamp precedes the perturbation. Appended VG water-content scale values follow the pore ratio, VG K follows the conductivity ratio, and VG shape parameters remain fixed. This revision does not consume the appended VG arrays downstream; active FC/WP/K columns are changed explicitly. All other soil lines and non-soil inputs remain identical. No repeated source conditioning.

Rationale and Alternatives

A primary field study motivates a modest coupled sensitivity, while leaving transfer limitations explicit. A universal absolute density target would erase material differences without adequate support. Density-only edits leave the storage/retention hypothesis unspecified; a global runtime switch already failed controls. Replacing generated profiles with legacy templates would not meet the program objective. Martin et al..

Consequences and Risk

The empirical context is trafficked forest soil, not a universal constructed-road model. Uniform treatment through 200 mm and fixed normalized retention shape are research assumptions. Applying the change to an already capped road is an incremental sensitivity, not a total-construction parameter estimate. Paved-road and fill treatment require separate justification. Numerical agreement alone cannot close these scientific gaps.

Evidence

Risk and Rollback Notes

No production values change, so no runtime rollback is required. Retain failed lanes and reject promotion on physical failure or control regression. Do not tune these coefficients after seeing outcomes. Any future production rule requires an amended/new ADR, full development and withheld validation, broader runtime and geometry checks, and independent scientific review. UI specification/layout approval remains a separate human gate before implementation.

Execution disposition

The frozen screen completed 348 runs with 348 independently recomputed physical passes. Pore-only, conductivity-only and coupled lanes recover 1, 24 and 25 of 96 misses respectively, each retaining 20/20 passing controls. Forty-two small- reference misses remain under the coupled treatment. No standalone production rule is accepted; retain the conductivity response as a component hypothesis. See results and verification.

Same-format downstream continuation — 2026-10-31

The requesting user's subsequent proceed continues autonomous scientific work; Codex selected the following narrower controls under that existing authority. The attempted whole-deck legacy-to-9002 bridge failed exact parity. Four of seven preflights match initialized state but add the format caution to LOSS; three also change surface conductivity through the remapping calculation. Retain the failed gate and do not execute mixed-role substitutions or relax production validation.

The new 116-case × three-lane diagnostic keeps every role in the original generated format and holds the road treatment fixed:

  • Fill: change only fill ksatadj from 1 to 0, removing its saturation-dependent effective-conductivity adjustment.
  • Buffer: cap only upper-200-mm buffer ksat at the configuration-matched legacy buffer avke, without increasing any existing value.
  • Both: combine the preceding controls.

The buffer value is an explicit template prior; it is not evidence that effective conductivity equals horizon saturated conductivity. Appended Rosetta predictions stay unchanged because these remain independent predictions, not active native K inputs in this revision. Source material, density, FC/WP, erodibility, road, deeper horizons, restrictions and runtime inputs are fixed. No new road divisor or per-climate fitting. These controls isolate narrower parameter mechanisms and do not claim to represent equivalent legacy roles or calibrated physical states.

The rationale is the retained downstream boundary evidence: 42 small-load misses remain after the road screen, with net fill addition and net buffer deposition. Testing conductivity treatment directly avoids introducing native adapter code or accepting numeric drift merely to enable a whole-role comparison. Require fresh physical/input/output verification and retain all 20 passing controls. Results remain research-only until all existing scientific gates are met.

Downstream execution disposition

Of 348 runs, 347 pass fresh physical audits. Fill-only, buffer-only and combined recover 8, 47 and 44 original misses but retain only 19, 17 and 17 of 20 passing controls. Reject all three standalone treatments. Fill-only exposes a reproducible DEPEND Newton-step SIGFPE; an independent scalar reference proves an interior root exists. Retain the fixture and prioritize bounded native root-search validation before further combinations. This ADR does not approve a native repair or binary delivery. Results and next gate.

Revision-4 factorial continuation

On 2026-10-31, the operator's continuing autonomous-work instruction authorizes combining the already declared diagnostic factors after native repair acceptance. Use a complete road-coupled x fill-fixed x buffer-cap factorial on the same 116-case panel, without changing any coefficient. Reuse only exact-revision-4 outputs with fresh artifact verification; execute the four missing road-enabled cells. This tests interactions that separate screens cannot establish. Existing physical-transfer limitations and control-regression rejection remain in force. No production rule is accepted by this research decision. See the predeclared plan.