ADR-0078: Portable projects with a PostgreSQL runs catalog

Status: accepted for implementation by operator execution request; independent contract reviews passed. Operating limits still require measured host acceptance, not an assumption of capacity. Date: 2026-09-30; predeployment implementation validated 2026-10-01 UTC. Forest deployment remains on hold.

Context and decision

Measurement clarification (implementation review): the unchanged 50 ms added-p95 target uses the producer's actual previous behavior. NoDb retains its timestamp SQL commit; TTL/READONLY do not have that baseline. Counterbalanced complete mutations, observer samples and legacy-helper characterization distinguish incremental work from phase-dependent storage latency. No durability setting or operating limit changes.

The production profile measured 169.56 seconds to build an 805-run catalog, dominated by project filesystem access. Keep files authoritative and standalone projects independent of PostgreSQL. Add one rebuildable run_catalog table beside existing run registration/access records. Replace NoDb's existing web-app timestamp coupling with an explicitly installed, storage-neutral post-commit observer.

Use bounded SQL invalidation, serialized current-source refresh, and scheduled reconciliation on existing infrastructure. Catalog reads use PostgreSQL only after explicit cutover. No automatic NFS fallback. Roll out forest, forest1 test production, then wepp1; each stage has its own evidence and promotion gate. The specification owns exact schema, protocols, user behavior, and release sequence.

Decision provenance

  • Venue: Codex conversation, September 30, 2026, America/Los_Angeles; artifact authoring recorded in UTC in the work-package tracker.
  • Participants in the original decision: requesting operator and Codex. Independent contract reviewers on 2026-09-30: Dirac (correctness) and Ohm (security/operations); findings and post-fix verdicts are retained in the disposition record.
  • Decision owner: requesting operator for portable-project requirement, architecture endorsement, and forest → forest1 → wepp1 sequence.
  • Specification author: Codex. Runtime implementer: not yet assigned.
  • Operator instruction: author the full specification with implementation and rollout sequence. This is not evidence of deployment execution or acceptance of unreviewed numerical limits below.

Operational parameters proposed for review

There are no changes to scientific formulas, TTL duration, or GC rules. New synchronization and presentation parameters are recorded explicitly rather than becoming undocumented implementation defaults.

Parameter Initial value Rationale
Sweep dispatch cadence 15 seconds Headroom for 60-second notified-update objective
Dispatch row limit 50 attempts Bound I/O and scheduler occupancy
Source-reader concurrency 2 per deployment Begin conservatively under measured NFS latency
New-work submission window 45 seconds Yield queue capacity between bounded sweeps
Reconciliation reservation At least 25% of attempts when due Prevent writes starving offline-change discovery
Transient retry delay 60 seconds Avoid immediate repeated I/O on unavailable sources
Full reconciliation due interval 12 hours Headroom for <=24-hour revisit/recovery target
Stale observation threshold 24 hours Align visible warning/TTL suppression with repair objective
Adapter connection / pool wait 1 second / 250 ms Bound save-path connection pressure
Adapter SQL lock / statement timeouts 250 ms / 1 second Avoid mirror work monopolizing a file-save lock
Adapter inline retries 0 Committed files remain authoritative; reconciliation repairs misses
Production healthy observation >=48 hours and a full reconciliation cycle; fixed nonproduction waits waived Exercise sustained production workload and offline repair; idle single-operator hosts cannot establish representative traffic
Post-wepp1 retirement observation 7 further healthy days Preserve explicit read rollback while collecting production evidence

Targets also include p95 <=1 second/p99 <=2.5 seconds for catalog/map requests on the 805-run scope, and healthy added notification p95 <=50 ms. These are release acceptance targets, not a claim the initial settings meet them. Forest capacity testing must validate or revise the values before promotion, retaining the measured workload, queue impact, NFS cost, and recovery time. Source outages are visible exceptions to healthy-infrastructure guarantees, not hidden success.

Operator amendment, 2026-10-01 UTC: forest and forest1 each have one human operator. Proceed to forest1 without a fixed 48-hour nonproduction wait; retain controlled correctness and worker/database/browser checks and mark unobserved elapsed recovery as unmeasured. Representative scale belongs on the first host with that dataset, before wepp1 cutover if unavailable earlier. This changes rollout evidence requirements, not reconciliation intervals or freshness limits.

Alternatives and consequences

Adding fields directly to run is feasible but mixes disposable projections with registration/ACL identity. PostgreSQL as the project authority would break standalone portability. SQL in property setters misses actual commit/failure boundaries and non-NoDb sources. Synchronous refresh on every save repeats NFS cost under writer locks. Callback-only synchronization loses crash/offline edits. An outbox, watcher, or new service is deferred unless measured bounded repair misses the acceptance condition; the crash gap is explicitly acknowledged.

The chosen design is eventually consistent, can briefly omit new unindexed projects, and can display labeled last-good metadata after transient failures. Known-dirty/old TTL observations are suppressed. These are explicit contract deltas, not incidental fallbacks; correctness/security review must examine them. Missing/invalid Ron retains current omission behavior. Readonly and deletion authority remain in their existing mutation paths.

Contract review refinements

Readiness depends on available Ron/READONLY metadata, not job completion or delivery of a finalizer notification. This preserves the existing reader's ability to list a partially initialized project and allows reconciliation to recover lost final events without a new durable lifecycle marker. Optional TTL failure clears the stored expiration, retains its observation time, and does not hide otherwise usable initial metadata. The expiration CHECK is null-safe.

Source resolution has a pure, descriptor-bound containment seam; grouped input repair is not part of catalog reads. Every eligible batch consumer must support the sweep before activation, even if older writers could otherwise be tolerated through reconciliation. Public RQ details for this multi-user maintenance job have a narrowly scoped redaction rule. Startup checks static configuration; live source/DB/sweep readiness gates promotion rather than process construction. These refinements close design contradictions without changing file authority, adding infrastructure, widening runtime permissions, or claiming runtime proof.

Risk, validation, and rollback

Risks include missed producers, NFS queue pressure during backfill, metadata lag, stale TTL display after a lost signal, deserialization incompatibility, registration races, and wrong-database companion workers. The specification requires real file/SQL/process/browser evidence and host/database identity checks.

Switch reads explicitly to legacy mode for rollback, retaining schema and healthy writers. Stop overloaded sweeps without erasing dirty state. Use the canonical deploy path for application rollback; never replay SQL into projects or drop tables to recover. Any adjustment to these workflow defaults updates this ADR and the specification before promotion.