ADR-0043: EU ESDAC Soil Quality Contract

Status: Accepted Date: 2026-08-19 Review Date: 2026-08-19 Review Owner: EU soil maintainer Ratification: User review confirmed; accepted for Phase 3 implementation

Context

The Phase 0 pilot sampled 1,000 valid ESDAC raster cells. Phase 1 replay captured a valid control, a degraded land-use metadata case, zero-valued STU data, non-increasing horizon depths, missing depth classes, missing Ksat coverage, and categorical lookup/provider exceptions. The current builder can write a .sol file for some invalid profiles or fail with an unstructured exception for others.

The work package needs an explicit quality result before Phase 3 adds a validation boundary. The contract must distinguish optional metadata loss from mandatory physical or structural invalidity and must not introduce a silent generic-soil fallback.

Decision

Adopt the following Phase 3 contract:

  1. Return valid when all source, derived, horizon, Ksat, and serialization invariants pass.
  2. Return degraded when optional land-use metadata is unavailable, or when a partially missing Ksat profile remains finite and model-representable. The warning must include field, location, raw state, and reason code.
  3. Return rejected for provider exceptions, unsupported required categorical values, unreadable depth classes, all-zero mandatory STU profiles, invalid texture balance, nonpositive density, non-finite derived values, non-increasing horizons, all-missing Ksat, or nonrepresentable output.
  4. Require clay/sand/silt percentages to be finite, bounded in [0, 100], and within one percentage point of a 100-percent texture sum. This tolerance is for integer source quantization, not a calibration or replacement rule.
  5. Allow individual zero texture components and zero gravel; reject an all-zero mandatory texture triad. Do not introduce an empirical density cutoff or an organic-matter minimum in this phase.
  6. Require serialized water contents to satisfy the already accepted contract 0 <= wilting_point <= field_capacity <= 1 from ADR-0012.

No production code changes are included in this ADR's Phase 2 commit. Phase 3 defines and tests the pure validation/result boundary and its location-aware diagnostics. Phase 4 wires that accepted contract into the ESDAC builder and worker aggregation without changing the quality policy.

Decision Provenance

  • Decision venue: EU disturbed-soil hardening work-package execution session, 2026-08-19, America/Los_Angeles.
  • Participants present: User and Codex, 2026-08-19.
  • Decision owner(s): EU soil maintainer.
  • Implementer(s): Codex, subject to the accepted contract.
  • Ratification: User reviewed ADR-0043 and confirmed that it is reasonable to ratify for Phase 3 implementation, 2026-08-19.

Change Summary

Current behavior has no structured valid/degraded/rejected result and can silently write decreasing horizon depths or represent an all-missing Ksat profile with 0.001.

Accepted behavior adds a field-qualified quality contract. It does not yet change runtime behavior, generated files, defaults, transfer functions, or fallback execution.

Rationale

Structural failures are unambiguous model-input defects: a second horizon cannot end before the first, and an all-zero mandatory STU profile cannot produce a physically meaningful layer. Optional land-use metadata does not invalidate the physical profile by itself, so it is observable degradation. The one-percentage texture tolerance preserves integer percentage source data without accepting materially incomplete texture profiles.

The contract rejects missing mandatory evidence instead of manufacturing a generic replacement soil. This keeps the failure actionable and preserves the distinction between upstream data quality and approved scientific fallback.

Alternatives Considered

  1. Treat every zero as invalid — rejected because zero gravel and individual zero texture components can be valid physical states.
  2. Treat every source gap as a generic fallback — rejected because it masks source/version/provider defects and changes model parameterization.
  3. Keep the current 0.001 all-missing Ksat representation — rejected because it converts missing evidence into a plausible-looking model value.
  4. Reject every missing optional metadata field — rejected because the Phase 1 control matrix shows a physically valid profile can exist with missing land-use metadata.
  5. Add empirical density or organic-matter cutoffs now — rejected because the pilot does not establish calibrated domain limits and no such thresholds are needed to catch the confirmed failures.

Evidence

  • Work package: docs/work-packages/20260819_eu_disturbed_soil_hardening/.
  • Phase 1 fixture: tests/eu/soils/fixtures/eu_disturbed_soil_phase1.json.
  • Replay tests: tests/eu/soils/test_esdac_quality_fixture.py.
  • Pilot result: 641 suspicious locations, 596 completed suspicious builds, 35 builder exceptions, 59 horizon-order findings, and 10 controls.
  • Related water-content contract: ADR-0012.

Consequences

Phase 3 will need a structured result/error carrier and a validation boundary before .sol serialization. Existing callers that expect only a soil key may need an additive diagnostic path. Locations currently producing invalid files will become rejected or degraded with visible reasons rather than silently accepted.

The one-percentage tolerance and Ksat policy are scientific/workflow parameterization decisions. If the EU soil maintainer changes them, this ADR must be amended before implementation.

Risk and Rollback Notes

Risk: legitimate edge profiles may be rejected if their source encoding falls outside the accepted contract. Phase 3 must retain the Phase 1 valid control, add a valid-zero matrix, and report rejection counts as a guardrail. Rollback is to revert the Phase 3 validation boundary while preserving the fixture and diagnostic tests; do not restore silent fallback without a revised ADR.

Amendment — 2026-11-06

ADR-0139 defines required data by the physical materials actually emitted, allows missing descriptive metadata with warnings, and handles shallow profiles using existing mapped depths. Consult the current source sufficiency contract for field policy and deterministic batch identity/retry behavior.