Context
The accepted peak-flow audit protocol requires absolute floors before ratios are used to screen mutation responses, but it intentionally did not assign numeric values. The Phase 2A pilot also needs a bounded tolerance for comparing three-significant-digit interval discharge output with two-decimal daily channel volumes. Without frozen values, near-zero numerical noise could create candidate flags or make routing-volume acceptance outcome-dependent.
Decision
Use fixed SI-unit floors for the Phase 2A diagnostic workflow:
- runoff depth denominator:
1e-5 m(0.01 mm); - peak-flow magnitude and difference:
1e-7 m/s; - surplus-rate denominator:
1e-8 m/s(0.036 mm/h); - observer no-surplus depth classification:
1e-10 m; and - channel interval-versus-daily volume agreement: absolute difference no more
than the larger of
0.1 m³or5%of reported daily outflow.
These values classify diagnostic evidence only. They do not alter WEPP inputs, equations, calibration, routing, or production parameter defaults.
Decision Provenance
Decision Venue: Codex Phase 2A ExecPlan execution, 2026-08-08 17:34 PDT
Participants Present: requesting operator, Codex
Decision Owner(s): requesting operator under the accepted Gate 2.1 protocol
Implementer(s): Codex
Change Summary
Previously, the protocol required preregistered absolute floors but left them unset. Phase 2A now applies the values above before evaluating the accepted 25%-peak/5%-runoff, twofold-peak, solver-switch, twofold-surplus-rate, and expected-response-reversal rules. The routing check applies its tolerance only after independently validating timestamp order and nonnegative discharge.
Rationale
The runoff floor excludes responses below 0.01 mm, the peak and surplus-rate
floors are above the observer's legacy minimum/small-value noise region, and
the volume tolerance accommodates the precision of the emitted text files
without masking material disagreement. The known-positive interval check
exceeds this tolerance by up to 35.7%, so its failure is not a rounding
artifact.
Alternatives Considered
- No absolute floors - rejected because ratios around zero dominated initial screening and contradicted the accepted protocol.
- Data-dependent quantile floors - rejected because mutation outcomes would influence classification and undermine preregistration.
- A looser routing tolerance - rejected because
chan.outandchanwb.outclaim compatible discharge and volume units, and discrepancies above5%are operationally material for this pilot.
Consequences
Candidate classification is deterministic and reproducible across reruns. Events below a floor remain in raw outer-joined ledgers but do not trigger a ratio flag. The volume rule can fail current watershed output even when all timestamps and discharges are valid; that failure withholds the full census until the two routing outputs share a reconciled volume authority.
Evidence
- Phase 2A completed ExecPlan
- Mutation terminal summary
- Hydrograph validation summary
- Accepted audit protocol
Risk and Rollback Notes
The main risk is excluding a scientifically interesting response below a floor. Raw values and mechanism flags are retained so reviewers can audit or rescreen them. Roll back by revising this ADR and rerunning classification over the immutable event-pair ledger; model execution does not need to be repeated.
Implementation Notes
The constants and derived flags live in tools/peakflow_phase2a_pilot.py.
Future phases must either reuse these values or supersede this ADR before