ADR-0038: Universal User Model-Responsibility Contract
Status: Accepted
Date: 2026-08-03
Review Date: 2027-08-03
Context
The WEPPcloud User Guide already stated that model outputs are approximations, required independent verification before consequential use, and assigned users responsibility for decisions and consequences. It did not state with equal clarity that users are also responsible for reviewing automatically selected or generated inputs, model configuration, and parameterization. The stronger parameterization language appeared only in suggested PowerUser training text.
That split could imply that ordinary users, automated setup, successful model
completion, or a stable feature label transfers scientific responsibility to
WEPPcloud. It does not.
Decision
Adopt one universal responsibility contract for anonymous, ordinary, PowerUser, and internal workflows. Users are responsible for:
- selecting and reviewing input and uploaded data, model configuration, parameter values, and parameterizations, including values WEPPcloud selects or generates automatically;
- determining whether the model, assumptions, parameterization, site, conditions, scale, and intended use are compatible;
- independently evaluating and validating outputs using site-specific observations, qualified professional judgment, comparison evidence, or other methods proportionate to the consequences of error; and
- deciding how outputs are interpreted, communicated, published, or applied.
Automation, defaults, successful completion, and stable maturity do not
certify calibration, validation, accuracy, or fitness for a particular purpose.
The canonical user-facing statement is the Legal Disclaimer in the WEPPcloud
User Guide. Release-governance and role-specific onboarding must not weaken it.
Decision Provenance
Decision Venue: Codex API workspace thread, 2026-08-03 PDT
Participants Present: requesting WEPPcloud operator; Codex
Decision Owner: requesting WEPPcloud operator
Implementer: Codex
Change Summary
Old contract: users bore responsibility for decisions and consequences and were required to independently verify outputs, while ordinary-user responsibility for run inputs and parameterization remained implicit.
New contract: responsibility expressly spans setup, automated inputs, configuration, parameterization, domain applicability, validation, interpretation, communication, publication, and application.
This amendment changes policy language only. It does not change model inputs, defaults, formulas, thresholds, access control, data retention, or runtime behavior. It does not add click-through acceptance or claim that the wording has received legal review.
Rationale
Scientific responsibility begins before execution and continues after results are produced. One universal statement is clearer than assigning output-use responsibility generally while discussing parameterization responsibility only for elevated roles.
Alternatives Considered
- Retain the existing disclaimer - rejected because parameterization and automated-input responsibility remained implicit.
- Apply the stronger wording only to PowerUsers - rejected because ordinary and anonymous runs have the same scientific interpretation risks.
- Treat successful or stable workflows as validated - rejected because operational maturity does not establish site-specific scientific validity.
- Add mandatory click-through acceptance in this amendment - deferred because that is a separate authentication, UX, record-retention, and legal-review decision.
Consequences
Users receive an explicit, role-independent statement of responsibility. Documentation and future onboarding or result surfaces must remain consistent with it. The amendment does not reduce WEPPcloud's responsibility to disclose known defects, limitations, provenance, or feature maturity accurately.
Legal counsel should review the disclaimer and any future acceptance mechanism when contractual enforceability is required; this ADR records product policy and scientific-use expectations, not a legal opinion.
Evidence
wepppy/weppcloud/routes/usersum/weppcloud/user-guide.md, Legal Disclaimerwepppy/weppcloud/routes/usersum/weppcloud/feature-maturity-and-release-governance.md, Core Principles and PowerUser Training Text- Operator request and clarification in the 2026-08-03 Codex API workspace thread
Risk and Rollback Notes
The principal risk is inconsistent wording across duplicated UI surfaces. Landing-page or action-boundary conformance changes remain subject to their applicable contract-first review and build gates. Rollback restores the prior policy text and records why responsibility for parameterization should again be implicit; it does not alter stored runs or model results.
Implementation Notes
The authoritative documentation is amended in this change. Generated Usersum search indexes remain governed by their normal build workflow. Do not hand-edit generated indexes.