# Postfire Debris Flow Implementation Roadmap

2026-09-16: [Kf/report revision package](../../../../docs/work-packages/20260916_postfire_kf_report_revisions/package.md)
implemented after ancestor `9395f4722`. New M1 prepares traceable STATSGO Kf
without POLARIS/RUSLE; the report evaluates a bounded curve with P50, numeric
values and rainfall-origin labels. Restarted forest UI/RQ acceptance passed on
nervous-mesquite and a no-RUSLE fixture, with independent raster/table checks and
canonical archive/restore. Full suite passed (8,693 tests, 103 skips); all final independent reviews PASS.
The package is closed. [Source/runtime contract](docs/kf_source.md); ADR-0068. Older dated
entries below describe their implementation stage and do not override this policy.

2026-09-15: fresh-basin Run preparation is wired after contract checkpoint
`e8c40adda`. The new regression reproduced the missing acquisition before the
fix. Source reuse, race rejection and retry pass 44 focused tests. Normal
browser/RQ acceptance on overpriced-sprawl produced all 27,450 event probabilities
with 100% valid coverage and no protected-input changes. No manual pre-acquisition.
Full regression: 8,632 passed, 103 skipped; remediation closed 2026-09-15.

Status: updated 2026-09-14. Production M1 NoDb, browser upload and RQ execution
are implemented. M1/M3 scientific composition, shared valid-support calculations,
authoritative preparation and publication are implemented. Dashboard remains pending.

Local M3 terrain/composition and basin-derived local soil-source preparation are
reviewed in the completed M3 package. Two independent grid/key fixtures exercise
authoritative activation and native runtime; 14 tests pass. Live development
M1/M3 browser/RQ, positive synthetic M3, builder parity and archive/browse checks
pass. The package closed 2026-09-14 with final regression evidence and explicit
owner acceptance of the recorded credential risk without rotation. No production
deployment is claimed; current behavior remains governed by the contracts below.

## Maintenance Contract

This is the living delivery tracker. [specification.md](specification.md) and
its named contracts remain the authority for scientific and runtime behavior.
Recommendations below are proposals until recorded as accepted decisions there.

For each implementation increment:

1. Resolve its blocking decisions in the specification and affected detailed
   contracts, including rationale and any required parameterization ADR.
2. Create an active ExecPlan for substantial work. Complete the repository's
   [contract-first checkpoint](../../../../docs/standards/contract-first-change-standard.md)
   before covered UI/NoDb/RQ implementation: operator approval, independent
   reviews, and a standalone contract ancestor commit.
3. Update this roadmap and the specification in the same change set as code.
   Distinguish accepted intent, implemented behavior, validated behavior, and
   deployment; completing one does not establish the others.
4. Record the package, implementation revision, validation evidence, remaining
   limitations, and disposition of each affected loose end here. Update the
   active package's plan and tracker before handoff.
5. Promote durable decisions into current contracts before package closure.
   Keep closed packages immutable; link them only as historical evidence.

## Completed Foundations

| Foundation | Delivered | Remaining integration |
| --- | --- | --- |
| M3 terrain | Owned WBT `D8UpstreamRelief`, production invocation, exact basin membership and enforced 10 m NED13/2022 eligibility. [Contract and evidence](docs/m3_terrain.md). | Calibration-preprocessing equivalence is not asserted; truncated terrain remains unavailable. |
| M3 soils | Isolated recorded-depth SSURGO-primary/original THICK fallback, bounded source acquisition and generic authoritative preparation. [Runtime contract](docs/production_m3_runtime.md). | Source acquisition requires separate bounded authority; historical raw-cache survey vintage can remain unknown. |
| dNBR | Local normalization/summary API, explicit encoding, project-grid alignment, partial coverage, provenance, and two public Arizona fixtures; `9b99d535c`. [Contract](docs/dnbr_upload.md), [validation](../../../../docs/work-packages/20260908_staley_dnbr/artifacts/validation.md). | Implemented in stage 5; development browser/worker validation recorded below. |

The offline soil study's complete-only outputs are not a production coverage
gate. SSURGO primary and original STATSGO fallback are accepted source priority.
Stage 5 adds the browser upload workflow to the local dNBR backend.

## Model Selection and Task Wiring

Owner request 2026-09-11: [M1/M3 UI and request wiring](docs/model_selection.md).
The shared comparison/header, side-by-side selector, conditional prerequisites
and dedicated M3 RQ task are implemented after checkpoint `aa30e637e`. Owner decisions fix
10 m NED13/2022 eligibility, retain automatic POLARIS/RUSLE enablement and
select scalar estimates with coverage masking. SSURGO validity assessment and
exact scientific integration remain explicit. Evidence is tracked in the
[model wiring package](../../../../docs/work-packages/20260911_staley_model_wiring/package.md).
Validation passed: full Python 8,468/103 skipped, frontend 872, independent
reviews and live selection/task/reload/preflight checks. The scaffold pending
task is superseded by actual M3 composition in the
[M3 scientific integration package](../../../../docs/work-packages/20260914_staley_m3_integration/package.md).
Common analysis support and recorded-depth soil policy were ratified at
checkpoint `89d673c38`. Isolated `soil_policy`, `soil_snapshot` and `soil_inputs`
now provide recorded-depth derivation, retained source copies and prepared-local
cellwise composition. Local M1 accepts opt-in common support and v2 masks/readers;
new production M1/M3 now uses v2 and publishes exact validity masks while
retaining legacy M1 reads. Generated soil-builder parity and live acceptance
are tracked in that package. The [production amendment](docs/production_m3.md)
requires read-only consumption and nonregression of existing SSURGO/STATSGO
soil building. Reports remain stage 7.

### Completed local predictor increment

[Local M1 predictor integration](../../../../docs/work-packages/20260909_staley_m1_predictors/package.md)
is implemented and validated locally with complete authentic Wallow evidence. It
composes the completed slope/SBS and dNBR
backends with RUSLE Nomograph K; see [accepted contract](docs/m1_predictors.md).
K policy is accepted in ADR-0059. Complete synthetic and authentic T/F/S outputs
and missing-input cases exist. Local Climate composition is implemented in stage 4; production publication is implemented in stage 5. Completed backend contracts are not reopened.

## Local Rainfall/Results Increment

The [rainfall/results package](../../../../docs/work-packages/20260909_staley_rainfall_results/package.md)
implements local M1 stage 4. Its [accepted contract](docs/rainfall_results.md)
covers events, design comparisons, inverse thresholds and bounded local queries.
R02 unavailable sparse-rank behavior is explicitly approved in ADR-0062. Backend
L08/L09 decisions are resolved; browser defaults/dashboard remain future scope.

## Production Upload/Run Increment

[Production M1 package](../../../../docs/work-packages/20260910_staley_m1_production/package.md)
implements stage 5 NoDb, freshness, dNBR upload/publication, RQ and
the minimal upload/run control. Reports are explicitly deferred by the owner.
Review the [UI contract](../../../../docs/ui-docs/contracts/postfire-debris-flow-control-contract.md)
and [workflow contract](docs/production_m1.md). Contract checkpoints are
`5c0a172ee` and `595816476`. Development end-to-end validation passed;
installation on other hosts and the owner's real-basin acceptance test remain separate.
Owner UI revisions recorded: live preflight prerequisites/NOAA availability,
differenced Normalized Burn Ratio label, no image-date entry, Auto-default scale
select, persistent uploaded filename and visible raster-format/datatype guidance.
Auto must attempt distribution-based scale detection and publish upload details
and the applied scale in a `wc-control__panel-summary` table. Detection criteria and fixture evidence are accepted in ADR-0063; bounded
correction retry is implemented. Final evidence and reviews are recorded in the package.

## Delivery Sequence

Build shared scientific components, deliver a usable M1 workflow, integrate M3,
then complete the interactive dashboard. M3 soil-policy work can proceed during
M1 development; M1 does not need to wait for that policy. Both models remain in
scope. SI/English presentation belongs in the first user-facing increment.

Stages 1–2 are **complete**, in the
[project watershed and numerical engine package](../../../../docs/work-packages/20260908_staley_watershed_engine/package.md).
Stage 3 slope/SBS local backend is **implemented and validated**, in the
[WBT slope/SBS package](../../../../docs/work-packages/20260908_staley_slope_sbs/package.md).
Local stage 3 composition is **complete**, including authentic complete-source
evidence. Local stage 4 is **complete**, with genuine CLI/NOAA and sparse-rank acceptance.
Production stage 5 is **complete** with development browser/worker validation.
Stage 6 is **implemented, acceptance in progress**. Stage 7
has an [owner-authorized report contract](../../../../docs/ui-docs/contracts/postfire-debris-flow-report-contract.md)
and [implementation package](../../../../docs/work-packages/20260915_postfire_debris_flow_report_implementation/package.md).
The saved report is implemented after checkpoint `ac4deb681`; M1/NOAA and M3/CLI
development browser acceptance passed without model reruns. Dashboard work remains deferred.
Stage completion requires its exit evidence,
not only source files. Accepted scope is the existing project watershed/outlet;
nested/channel assessments are excluded from initial delivery (ADR-0055).

| Stage | Scope and dependencies | Exit evidence |
| --- | --- | --- |
| 1. Assessment contract | Reuse the existing project watershed and resolved outlet; document authoritative mask/grid/outlet identity and full contributing-area support. Track slope/SBS/NoData decisions for stage 3. | Accepted single-watershed scope (done); canonical artifact mapping and independently checked mask/outlet evidence (done). |
| 2. Numerical engine | Implement `staley2017.py` for both M1 and M3. Can begin after its numerical contract is resolved, independently of spatial implementation. | Complete: checked coefficients, ADR-0056, 145 focused tests, six-row generated examples, independent review and full-suite validation. |
| 3. M1 predictors | Depends on stage 1 and accepted slope/SBS/NoData rules. Aggregate slope/SBS intersection, normalized dNBR, and RUSLE Nomograph K over the project watershed; emit coverage, reasons, and input identity. | Reproducible real-project predictor artifacts; correct intersection and full-domain denominators; partial and unavailable watershed checks. |
| 4. Rainfall and results | Compose stages 2–3 with Climate-owned event parquet and frequency artifacts. Define event identity, schemas, canonical units, and querying. | Complete: genuine event/design/inverse bundles, ADR-0062 sparse-rank policy, bounded queries, 62 focused and 8,273 full-suite passes, independent reviews; [evidence](../../../../docs/work-packages/20260909_staley_rainfall_results/artifacts/validation.md). |
| 5. Production M1 | Integrate stages 1–4 through NoDb, safe dNBR upload/publication, prerequisite checks, RQ, and a minimal Pure UI upload/run control; reports deferred. | Contract checkpoint followed by upload → build → results → reload under production-equivalent identities/mounts; stale inputs, failed replacement, authorization, and SI/English equivalence verified. |
| 6. Production M3 | Resolve soil policy; compose SSURGO/fallback thickness and owned WBT relief with the shared engine and production workflow. Soil-policy preparation may precede stage 5. | Explicit source contribution/coverage, unusable-both-sources cases, terrain fidelity gate, and real-project M3 results through the same publication/report path. |
| 7. Interactive dashboard | Use established result/query contracts for project watershed events, detail, design comparisons, and thresholds; maps may show the existing basin and input coverage. | Event selections remain consistent; no nested catchment selector; partial/unavailable results, simulation dates, unitization, accessibility, and realistic catalog performance verified. |

Recommended architecture: separate predictor preparation from rainfall
evaluation so climate changes do not require terrain/soil/dNBR recomputation.
Define exact invalidation edges in stage 5's contract. Benchmark stored results
against evaluation on demand for the project event × model × duration catalog
in stage 4. There is one assessment watershed per project.

## Loose Ends and Decision Gates

IDs are stable tracking labels, not payload fields. Close a row by linking its
accepted specification/ADR section and implementation evidence; retain any
scientific limitation that implementation cannot resolve.

| ID | Decision or remaining work | Resolve before | Current authority / status |
| --- | --- | --- | --- |
| L01 | Scope resolved: existing project watershed and existing outlet. Confirm canonical artifact mapping; no new outlet selection or nested enumeration. | Stage 1 completion | [Accepted scope](specification.md#project-watershed-assessment-scope), [ADR-0055](../../../../docs/adrs/ADR-0055-staley-project-watershed-scope.md); [artifact audit completed](../../../../docs/work-packages/20260908_staley_watershed_engine/artifacts/watershed_artifact_audit.md). |
| L02 | Slope algorithm, SBS class mapping, unknown pixels, soil/K coverage, and independent predictor denominators. | Stage 3 implementation | [Slope/SBS backend](docs/slope_sbs.md) and both WBT bindings validated; Horn, raw DEM, strict edges and uncertainty preservation recorded (ADR-0058). Full K coverage without additional fill is accepted in ADR-0059; partial K remains diagnostic. |
| L03 | Coefficient verification, stable sigmoid/logit, permitted rainfall/probability inputs, zero/negative denominators, negative or unreachable thresholds. | Stage 2 implementation | Resolved in [engine contract](docs/staley2017_engine.md) and [ADR-0056](../../../../docs/adrs/ADR-0056-staley-numerical-engine.md), including review fixes for adjacent targets and inverse underflow. |
| L04 | K calibration units, artifact provenance/freshness, full RUSLE versus K-only readiness, and M3's RUSLE prerequisite. | Stages 3 and 5 | [RUSLE dependency](specification.md#rusle-and-polaris-dependency). M1 K-artifact readiness and identity scale are accepted in ADR-0059; M1 production freshness is enforced in stage 5; M3 requirements remain separate. |
| L05 | Soil material inclusion, horizon validity, incomplete components, fallback granularity/triggers, and residual missing coverage. | Stage 6 implementation | Accepted and implemented recorded-depth policy, ADR-0067 and [runtime contract](docs/production_m3_runtime.md). Strict offline study is unchanged. |
| L06 | Prepared SSURGO inventory, substituted/custom/legacy soils, STATSGO source delivery and freshness; neither source usable. | Stage 6 integration | [Soils readiness](specification.md#availability-and-soils-readiness), [soil contract](docs/m3_soil_thickness.md). No implicit soil rebuild or acquisition authority. |
| L07 | Adopt genuine 10 m M3 requirement; detect source fidelity, validate installed WBT tool/bindings, and sample accepted relief/area at assessment outlets. | Stage 6 integration | [Terrain contract](docs/m3_terrain.md). Calibration-preprocessing equivalence remains unproven; upsampling does not establish fidelity. |
| L08 | Ratify 1/2/5/10-year × 15/30/60-minute matrix, CLIGEN/NOAA selector/default, sample guidance, precision, and inverse target probabilities. | Stage 4 implementation | [Rainfall contract](docs/rainfall_results.md), ADR-0062: local source/matrix/sample policy accepted; explicit inverse targets. Stage 5 accepts Project climate by default and the fixed matrix with 50% inverse target; dashboard defaults remain stage 7 scope. |
| L09 | Stable event IDs, source/date semantics, result/export schemas, query strategy, catalog limits, and filter defaults. | Stage 4 completion | [Rainfall contract](docs/rainfall_results.md): local event IDs, schemas, limits and deterministic queries implemented. Dashboard filters remain stage 7 scope; fixed predictors, no recovery simulation. |
| L10 | Upload packaging, path authorization, CSRF, resource limits, replacement, concurrent builds, atomic publication, and failed-build preservation. | Stage 5 implementation | Implemented under [production M1 contract](docs/production_m1.md); [development validation](../../../../docs/work-packages/20260910_staley_m1_production/artifacts/validation.md). [dNBR backend contract](docs/dnbr_upload.md) plus shared transport/NoDb contracts; local backend trust assumptions do not define browser safety. |
| L11 | Exact dependency fingerprints and invalidation for DEM/routing, Soils, SBS, K, dNBR, climate, parameters, and results. | Stage 5 implementation | Implemented under [production M1 contract](docs/production_m1.md); [development validation](../../../../docs/work-packages/20260910_staley_m1_production/artifacts/validation.md). [Compatibility plan](specification.md#compatibility-and-validation-plan). Preserve old `debris_flow.nodb`; define additive schemas and stale-result presentation. |
| L12 | Effective CONUS locale mapping, legacy `us`, cross-boundary footprints, and server/UI prerequisite parity. | Stage 5 implementation | Implemented under [production M1 contract](docs/production_m1.md); [development validation](../../../../docs/work-packages/20260910_staley_m1_production/artifacts/validation.md). [Availability](specification.md#availability-and-soils-readiness). WBT/CONUS/built Soils accepted; Western US guidance is not a second regional gate. |
| L13 | Exact Unitizer categories, API normalization, export units, and age/area evidence-domain presentation. | Stage 5 implementation | [Unitization](specification.md#unitization-contract), [scientific context](specification.md#scientific-model). Area warning is implemented outside inclusive 0.2–8 km² (ADR-0057), with project SI/English presentation and canonical SI exports. No age input/gate in M1; future age policy remains open. |
| L14 | Control/feature registration, payloads, job graph, dashboard host, accessibility, and empty/partial/legacy/hostile states. | Relevant stages 5–7 implementation | [Planned organization](specification.md#planned-file-organization) and shared UI/RQ contracts; M1 runtime contracts and control are implemented; dashboard/accessibility work remains stage 7 scope. |

## Progress Log

- 2026-09-14: scaffolded production M3/shared-support package and active ExecPlan.
  Recorded owner approval of common M1/M3 support with full-basin M3 ruggedness.
  Reviewed manuscript and NRCS documentation; legitimate paired horizons and
  above-100 component totals need explicit production policy. Soil-builder
  preservation includes source-write checks and generated WEPP input parity.
  No runtime implementation, source acquisition or soil rebuild performed.

- 2026-09-11: Predictor TIFF verification now uses the operator-selected 96 MiB
  cap through final recheck, independently of rainfall's 64 MiB limit. See
  [artifact admission repair](../../../../docs/work-packages/20260911_staley_predictor_artifact_limit/package.md).

- 2026-09-11: [Upload/status repair](../../../../docs/work-packages/20260911_staley_upload_status/package.md)
  admits validated internal statistics caches, prepares a self-contained DEM,
  tracks external mask freshness, and restores linked job IDs, failure reload,
  status layout and safe retry callbacks. Validation and live verification are
  tracked in the package; reports remain deferred.


- 2026-09-09 UTC: owner selected a nonblocking warning outside the manuscript's
  inclusive 0.2–8 km² study range, for both models. Accepted in the specification
  and ADR-0057; use full unrounded watershed area and preserve model results.
  Add warning propagation in stage 4 and user-facing presentation in stage 5.
  The completed scalar engine has no area input and remains unchanged.

- 2026-09-09 UTC, post-closeout owner decision: the supplied manuscript is
  authoritative for the study's 0.2–8 km² catchment range. Corrected the
  unsupported 0.02 km² lower bound in the specification and retired the
  source-reconciliation caveat. This updates evidence-domain guidance only;
  no engine parameter or area gate changes. See
  [Published Coefficients and study context](specification.md#published-coefficients).

- Baseline: terrain and soil evaluations and local dNBR backend are complete;
  remaining stages and loose ends recorded. Next work: assessment contract and
  numerical engine. No production implementation or deployment is claimed.

- 2026-09-09 04:18 UTC: owner selected the existing project watershed/outlet and
  manual isolation of suspected burned basins. Removed the per-channel proposal
  from initial scope; synchronized the specification and dashboard description.
  First package scaffolded for stages 1–2; numerical policies remain proposed in
  its decision register. No executable implementation started.

- 2026-09-09 04:33 UTC: verified publication coefficients and equations; audited
  existing Topanga watershed in the container (49,917 cells, outlet included,
  matching grids and unchanged hashes). Stage 1 mapping is now documented in
  the specification. Stage 2 contract is drafted in
  [staley2017_engine.md](docs/staley2017_engine.md), explicitly proposed pending
  N01–N04 owner resolution; engine implementation and final review remain.

- 2026-09-09 UTC: owner approved N01–N04; implemented pure scalar engine,
  generated synthetic examples for six model/duration rows and passed 145
  focused tests. Independent correctness review resolved adjacent-baseline
  cancellation and inverse underflow; no open findings. Full-suite validation
  and package closeout are running. L01/L03 are resolved; L02 and L04–L14 remain.

- 2026-09-09 UTC closeout: stages 1–2 complete. Full suite passed 7,959 tests
  with 72 skips; final focused suite passed 145. Container fixture and synthetic
  example reproduction, API/stub and docs gates passed; plan archived and board
  moved to Done. See [validation](../../../../docs/work-packages/20260908_staley_watershed_engine/artifacts/validation.md).
  Stage 3 starts with slope/SBS/K unit/support policy; stages 3–7 remain pending.

- 2026-09-09 05:08 UTC: scaffolded owned WBT slope/SBS package for part of
  stage 3. Initial source inspection distinguishes FVSlope, Florinsky and Horn;
  Horn/raw DEM recommendation requires evidence and policy disposition. No
  nested catchments, new M1 resolution gate or runtime wiring introduced.

- 2026-09-09 UTC: owner explicitly adopted Horn 3×3 (ADR-0058). Raw DEM,
  edge handling and incomplete-support behavior remain pending; comparisons
  now characterize the selected method rather than reselect its algorithm.

- 2026-09-09 UTC: owner accepted uncertainty preservation for slope/SBS.
  Unknown intersection cells retain T bounds and unavailable point T; no
  partial-support extrapolation. Verified the supplied pysheds link describes
  routed drop/distance, not Horn; it is not calibration-parity evidence.

- 2026-09-09 UTC: [historical USGS evidence](docs/historical_slope_evidence.md)
  confirms ArcGIS planar/Horn-style slope in the preserved 2022-named workflow.
  The modern directional helper follows a 2023 migration; its predictor
  compatibility is a suspected regression to investigate. Original 2017
  calibration method is still unconfirmed. Do not use current pfdf as M1 T oracle.

- 2026-09-09 UTC: completed the local StaleySlopeSbs Rust backend, both bindings,
  60 analytical and 24 security CLI checks, six-terrain panel and independent
  reviews. [Validation and limitations](../../../../docs/work-packages/20260908_staley_slope_sbs/artifacts/validation.md).
  Stage 3 remains partial: K integration, normalized dNBR composition and
  production predictor preparation/orchestration are successor work. No binary
  installation or deployment was performed.

- 2026-09-09 15:06 UTC: [local M1 predictor package](../../../../docs/work-packages/20260909_staley_m1_predictors/package.md)
  scaffolded for remaining local stage-3 composition. See the
  [accepted contract](docs/m1_predictors.md). Covers WBT-compatible prepared
  inputs, independent T/F/S support and provenance. K unit verification,
  coverage policy and artifact-only readiness remain decision gates. Execution
  has not started; live publication and UI/RQ remain stage 5 work.

- 2026-09-09 execution: owner accepted P02/P03, recorded in ADR-0059. Local
  adapter and 50 boundary tests implemented; actual binary generated synthetic
  complete and authentic `strained-mod` missing-dNBR bundles. Correctness findings
  closed. Full suite: 8,016 passed, 72 skipped; API/stub/docs gates passed.
  Stage 3 remains open for authentic complete
  source evidence. No production publication or climate integration claimed.

- 2026-09-09 UTC: owner rebuilt Wallow using final polygon SBS. Matching June 23
  dNBR and rebuilt Nomograph K yield full T/F/S support on 12,973 cells, zero
  unknown intersections and explicit scenario outputs. Local stage 3 acceptance
  is complete; area applicability warning retained. Production wiring remains
  stage 5 scope.

- 2026-09-10 05:15 UTC: reviewed completed M1 contract/validation and authentic
  Wallow acceptance; scaffolded local rainfall/results package. Climate CSV
  rounding, missing-column zeros and sparse-duration rank clamping are explicit
  decision gates. Review is read-only, not a new correctness/security signoff.

- 2026-09-09 Pacific execution: stage 4 local adapters/results/query implementation
  and genuine Wallow CLI/NOAA artifacts exist. Sparse-rank R02 approval remains
  pending, so stage 4 stays open. See the rainfall/results tracker for focused,
  full-suite and independent review evidence. Stages 5/7 remain unimplemented.

- R02 owner approval: unsupported CLI positive ranks now retain unavailable rows
  with rank/count diagnostics, preserving supported scenarios and Climate CSV
  parity. Final validation and package closure are recorded in the tracker.

- 2026-09-10 06:50 UTC closeout: local stage 4 complete. Explicit R02 approval,
  62 focused tests, 8,273 full-suite passes (77 skips), genuine CLI/NOAA and
  controlled sparse/unknown-T evidence, and independent review gates passed.
  ExecPlan archived. Backend L08/L09 resolved; browser defaults and production
  publication/dashboard remain stages 5–7.

- 2026-09-10 07:23 UTC: owner scoped production upload/run with NoDb,
  prerequisites/freshness, publication and RQ. Scaffolded exact simple UI
  labels/layout/state proposals and runtime checkpoint. Reports/dashboard
  deferred; completion status and protected model-file access only. No runtime
  implementation or deployment; UI/default approval remains pending.

- 2026-09-10 production M1 closeout: stage 5 complete. NoDb state, live owner
  freshness, distribution-based dNBR upload/correction, RQ and minimal control
  passed actual development browser/worker acceptance. Full Python 8,312 passed/77
  skipped; focused production 14 and frontend 841 passed, required reviews/gates
  passed. L10–L12 and M1 portions of L04/L08/L13/L14 are delivered. Reports,
  dashboard, M3 and the owner's real-basin acceptance remain separate. Runtime
  changes are uncommitted. [Evidence](../../../../docs/work-packages/20260910_staley_m1_production/artifacts/validation.md).

- 2026-09-11: wired the published M1 task into preflight with TaskEnum 🌋,
  independent of legacy debris and WEPP execution. Partial publications count as
  complete; timestamp invalidation is advisory and detailed artifact freshness
  remains authoritative. See [completion contract](docs/production_m1.md#preflight-completion-task)
  and [validation package](../../../../docs/work-packages/20260911_staley_preflight/package.md).

- 2026-09-11: corrected completed-output layout to publish events.parquet,
  design.parquet, inverse.parquet, and manifest.json directly in
  postfire_debris_flow/, browsable like other module outputs. Existing accepted
  results can be republished without rerunning the numerical engine. See the
  [direct-output package](../../../../docs/work-packages/20260911_staley_public_outputs/package.md).

- 2026-09-11: [Artifact observability](../../../../docs/work-packages/20260911_artifact_observability/package.md)
  replaces hidden attempts with visible `attempts/`, preserves failed work and
  per-attempt receipts, and installs canonical review/CI retention gates.
  `addicted-reservist` migrated without changing raster/table bytes; freshness,
  ordinary browser/downloads, and archive/restore verified. Offline M3 counting
  rasters are retained as inspectable support evidence. M3 production and reports
  remain deferred.

- 2026-09-11: [Enqueue handoff fix](../../../../docs/work-packages/20260911_staley_enqueue_handoff/package.md)
  removes the successful post-enqueue NoDb write that raced an immediately
  starting upload/model worker. Exact queued receipts persist before admission;
  85 focused tests and an actual retained-upload retry passed.

## 2026-09-17 active CLI repair

Worker admission, source preparation and publication accept only settled active
CLI ctime drift verified against admission bytes. Contract checkpoint `567eacf7d`;
[delivery evidence](../../../../docs/work-packages/20260917_postfire_active_cli_identity/package.md).
Other source and artifact guards retain their existing semantics.

## NFMS-01 failed migration mutation consistency

The 2026-10-30 NFMS-01 package adds the shared failed-state scope to manual
migration mutation. This is bounded persistence consistency work, with no model,
receipt, publication or migration-resume contract change. Real serialization
failure/resume tests must assert held-reference state as well as durable bytes;
manual repair of the controller in the test is not recovery evidence.