# AgFields Routing Scheme Suite

**Status**: Closed 2026-07-15 - engineering complete; science evaluation pending
**Timezone**: UTC

## Overview

The completed Concept 2 implementation preserves independent sub-field water and
sediment accounting, but the connectivity inventory for
`sacral-self-discipline` found direct channel drainage for only 3,269 of 6,626
retained sub-fields (49.3%). This package reopens Concept 1 and adds a hybrid that
uses direct outlet injection only for channel-connected sub-fields while routing
the remaining sub-fields through field-aware parent OFEs.

The runs-page UI will let a user run one routing scheme or all three. Each scheme
owns an independently repeatable output root under
`wepp/ag_fields/watershed/{concept-1,concept-2,hybrid}/`; there is no `all/`
result directory.

The geometry, mixed-source accounting, and complete management/runtime corpus now
pass. The synchronized forest and WEPPpy hillslope management capacity is 32,
selected from a measured maximum of 24 plus eight slots of headroom. Exact release
execution completed all 1,869 Concept 1 and 1,644 hybrid residual parents. The one
finite-input p1857 numerical failure was resolved at the forest model boundary
with ablation evidence; no AgFields management source was coerced. UI/API/RQ
and the faithful Concept 1/hybrid collaborators, per-scheme state, authenticated
RQ/API contract, serial Run All chain, and description-first UI are now wired.
All three current scheme roots and the engineering comparison bundle are complete.
The post-run protected inventory is byte-identical across 160,671 files and
39,066,986,682 bytes. Fields, rotations, and failures are not silently dropped,
coerced, or substituted with Concept 2. See the
[Concept 1 feasibility evidence](artifacts/2026-07-14_concept1_feasibility.md) and
[management capacity/corpus results](artifacts/2026-07-14_management_capacity_corpus_results.md).

## Objectives

- Implement a faithful field-aware OFE routing scheme (Concept 1) that preserves
  the accepted parent plan and routes represented field loads through downstream
  OFEs.
- Implement a connectivity-aware hybrid that uses Concept 2 for a sub-field when
  at least one generated per-cell flowpath enters a channel directly and Concept
  1 otherwise.
- Preserve source area exactly in every parent, including mixed hybrid parents;
  never inject connected sources on top of an unchanged full-area Concept 1
  source.
- Add a description-first UI choice for Concept 1, Concept 2, hybrid, or all, with
  Concept 2 as the backward-compatible default.
- Write scheme-specific state, manifests, watershed outputs, and evaluation
  evidence without changing baseline or independent AgFields artifacts.
- Produce generated-output evidence on
  `/wc1/runs/sa/sacral-self-discipline` for Mariana Dobre's science evaluation.

## Scope

### Included

- Parent-level one-dimensional OFE planning, eligibility diagnostics, explicit
  breakpoint slope segmentation, and multi-OFE soil/management synthesis for
  Concept 1.
- A synchronized `/workdir/wepp-forest_260430_baseline` hillslope management
  capacity increase selected from the complete Concept 1/hybrid corpus, plus
  matching forest release/vendoring and WEPPpy generation limits.
- Complete corpus parsing/execution with stable classification of capacity/parse,
  invalid-input, numerical-model-state, and environment/fixture failures.
- Canonical AgFields management-ingest validation for objectively invalid source
  values and forest ablation hardening for finite-input numerical producer faults,
  with no undocumented science mutation.
- An additive Peridot connectivity-detail output that reuses the existing direct
  channel-drainage classifier and identifies every retained sub-field
  deterministically.
- Hybrid parent composition for pure Concept 1, pure Concept 2, and mixed parents,
  with explicit residual-area accounting and no silent scheme substitution.
- A shared scheme interface over the existing Concept 2 integrator and the new
  Concept 1/hybrid implementations.
- Additive NoDb state, RQ jobs, rq-engine payloads, runs-page controls, result
  links, clear actions, staleness, and failure provenance for each scheme.
- The fixed scheme roots:
  - `wepp/ag_fields/watershed/concept-1/`
  - `wepp/ag_fields/watershed/concept-2/`
  - `wepp/ag_fields/watershed/hybrid/`
- Unit, integration, frontend, queue-contract, security, generated-output, and
  compatibility validation.
- Updates to AgFields design, module, UI, API, output-scope, and operator
  documentation affected by the implementation.

### Explicitly Out of Scope

- Replacing the independent per-sub-field AgFields runs or their canonical
  outputs.
- Treating the direct-channel classifier as a sediment-delivery ratio, buffer
  efficiency model, travel-time estimate, or science acceptance criterion.
- Silently falling back from an ineligible Concept 1 or hybrid parent to another
  routing scheme.
- Automatically moving, rewriting, or deleting the completed legacy Concept 2
  tree at `wepp/ag_fields/watershed/{runs,output,manifest}`.
- Making one scheme the scientific default based on engineering results alone;
  Mariana owns the science disposition.
- Extending the standard reports to AgFields scheme results unless the canonical
  output-scope contract and its route/report tests are updated in the same change.
- General two-dimensional field routing. Concept 1 remains a documented
  one-dimensional abstraction of the parent hillslope.

## Incident Hardening Addendum

The authenticated Concept 1 job
`70750bcd-0e70-4906-b25c-0e6f827b9bb1` exposed an in-scope worker-availability
defect during hillslope interchange on 2026-07-15. The configured 16-process
ceiling bounded active parsers, but `write_parquet_with_pool()` submitted all
3,543 files at once and retained completed, out-of-order Arrow tables in futures
and a writer-side dictionary. During `H.wat` conversion, sampled worker-cgroup
anonymous memory reached 61,335,310,336 bytes. No cgroup OOM, swap growth, or
scientific-output failure occurred, but the retention pattern could exhaust a
smaller worker.

**Scope boundary**: Fix the confirmed interchange result-retention path without
changing parser schemas, source ordering, routing formulas, worker defaults, or
unrelated WEPP/RQ execution.

**Hardening hypothesis**: If parser submission uses a rolling window no larger
than `max_workers` and the parent writes each result in source order, then no more
than 16 parsed tables are retained and generated interchange anonymous memory
will remain below 16 GiB, while row ordering and Parquet schemas remain identical.
The immediate observation window is the final generated rerun in this package;
the post-merge health window runs through 2026-08-14.

The first generated post-fix measurement completed on Concept 2 at 07:08:20 UTC.
Its entire job peaked at 11,978,174,464 bytes (11.16 GiB) of sampled worker-cgroup
anonymous memory, with zero cgroup OOM events. Hybrid then reached
46,695,247,872 bytes on the same rolling implementation because its 25.57 GB
multi-OFE WAT corpus materialized much larger complete Arrow tables than Concept
2's 3.99 GB single-OFE corpus. The Concept 2 measurement therefore did not prove
the bound across schemes.

The final hardening step moves the complete sorted WAT file list into one
wepppyo3 call. Rust loads the calendar once, parses one source into compact arrays,
and immediately writes that source's Parquet row group without returning full
tables through Python. On the generated Hybrid corpus, it wrote 108,308,610 rows
in 571.737 seconds at 489,709,568 bytes (0.456 GiB) sampled anonymous memory,
98.951% below the rolling-pool Hybrid peak, with zero OOM events. Exact
schema/value parity passed on a multi-file fixture, and the real artifact retained
the expected version metadata and schema. The authenticated three-scheme
acceptance sequence is the package measurement; its deferred Hybrid was
deliberately replaced after Concept 1 exposed the downstream aggregation defect.

The final Concept 1 run confirmed that direct WAT writing alone does not bound
the complete interchange phase. After direct writing completed at low memory,
`run_totalwatsed3()` applied a per-row window expression to the 172,364,760-row
WAT table and the worker reached 59,396,808,704 bytes of sampled anonymous
memory. The query now derives the last OFE once per hillslope in a bounded maxima
relation and joins that small relation to WAT. A full Concept 1 regeneration
completed in 28.55 seconds at 10,238,947,328 bytes maximum RSS. The before/after
tables retain 6,210 rows, 79 columns, identical schema metadata, null masks, and
integer values; all floating values agree at `rtol=1e-12, atol=1e-12`, with a
worst relative difference of `2.34e-15` from parallel summation order.

The final Hybrid job then completed every scheme stage and published all required
resources, but continuous sampling caught a brief 20,510,617,600-byte peak after
direct WAT writing. The individual WAT, soil, and element aggregates measured
0.85 GB, 5.86 GB, and 1.54 GB maximum RSS; the excess came from DuckDB retaining
their scan/aggregation buffers across one shared connection. Each large
aggregation now owns and closes a separate connection. Full Hybrid regeneration
completed in 16.73 seconds at 6,104,309,760 bytes maximum RSS, 70.2% below the
retained-connection peak. Its 6,210-row, 79-column output retains identical schema
metadata, null masks, and integer values; floating values pass
`rtol=1e-12, atol=1e-12`, with a worst relative difference of `1.63e-15`.

- Primary health signals: WAT defaults to direct wepppyo3 row-group writing,
  `totalwatsed3` derives last-OFE ids from a per-hillslope maxima relation and
  closes one DuckDB connection before opening the next large aggregation, other
  outstanding interchange futures never exceed `max_workers`, the
  dev-project interchange peak stays below 16 GiB, and the target job completes
  without OOM or manual recovery.
- Guardrails: existing interchange tests preserve schema/order/empty-output and
  atomic-commit behavior; generated elapsed time must not exceed twice the
  unbounded run without a documented review.
- Danger signals: WAT logs the Python compatibility fallback, anonymous memory
  again grows with input-file size, an
  `.attempt-*` path appears in a published manifest, ordering/schema tests regress,
  or a worker experiences OOM/forced restart.
- Sunset criteria: no temporary retry, feature flag, or delay was added. The
  direct WAT path and rolling bounds are invariants; the explicit compatibility
  fallback remains only for older native releases and is a danger signal, not an
  accepted generated path. Reconsider either invariant only with replacement
  parity and bounded-memory evidence. Review the 30-day signals after 2026-08-14.

The same acceptance run also found that terminal `required_resources` entries
were resolved against the staging root and therefore retained `.attempt-*` path
components after atomic publication. Resource provenance now maps staged files to
their fixed published scheme root before the manifest is written; a focused
regression freezes this contract.

Related precedent is the
[WEPP interchange dependency race guard](../20260428_wepp_interchange_dependency_race_guard/package.md),
whose deterministic ordering and atomic-output expectations are reused, and the
[Browse Arrow/pandas elimination package](../20260616_browse_arrow_pandas_elimination/package.md),
whose explicit large-Parquet memory discipline is reused. This incident differs
because it is an in-process completed-result backlog rather than an RQ dependency
race or an interactive preview allocation. The lifecycle and signal requirements
come from the
[hardening lifecycle standard](../../standards/hardening-lifecycle-standard.md).

## Implementation Fidelity and Evidence

- **Fidelity target**: `faithful implementation`. A planner-only or surrogate
  Concept 1 is a non-closable intermediate milestone.
- **Authoritative source paths**:
  `wepppy/weppcloud/routes/usersum/weppcloud/ag_field-mod.md`,
  `wepppy/nodb/mods/ag_fields/watershed_integration.py`,
  `/workdir/peridot/src/subfield_channel_connectivity.rs`, and the current
  WEPPpy/wepppyo3 MOFE synthesis paths named in the completed ExecPlan.
- **Cutover proof required**: the authenticated UI/API/RQ path must create current
  results in each selected scheme root, hydrate independent per-scheme state, and
  leave the protected baseline, independent AgFields, and legacy Concept 2 trees
  byte-identical.
- **Acceptance evidence type**: `both`; focused fixtures and generated output from
  the designated dev project are required.
- **Current feasibility disposition**: `implementation continues`; planning,
  explicit-breakpoint synthesis, one real mixed-parent native run, the synchronized
  capacity cutover, and every required Concept 1/hybrid management/input tuple
  pass. Scheme state, Concept 1/hybrid collaborators, RQ/API orchestration, and UI
  are wired; authenticated generated all-scheme acceptance, the comparison
  bundle, and protected-tree verification are complete.

## Routing Scheme Contract

The machine identifiers accepted at the Python/API boundary are `concept_1`,
`concept_2`, and `hybrid`. Their filesystem slugs are `concept-1`, `concept-2`,
and `hybrid`. The UI-only value `all` expands to those three identifiers in that
stable order and never appears in a result path or persisted scheme manifest.

The exact initial visible labels are:

- **Field-aware hillslope routing (routes fields through downstream OFEs)** -
  Concept 1.
- **Direct sub-field outlet injection (preserves independent sub-field results;
  no buffer routing)** - Concept 2.
- **Connectivity-aware mixed routing (injects channel-connected fields; routes
  other fields through OFEs)** - hybrid.
- **Run all routing schemes (writes three separate results for comparison)** -
  sequentially enqueue all three schemes.

Concept 2 is selected when an old client omits the scheme and is the initial UI
default. This preserves the behavior of the completed route while making its
physical limitation explicit in the label.

The hybrid classifier is the existing Peridot definition: a retained sub-field is
channel-connected when at least one of its generated per-cell flowpaths has a
valid D8 successor outside the sub-field and that first outside cell is a channel.
Positive cells in an explicit channel mask take precedence when supplied;
otherwise a SUBWTA identifier ending in `4` identifies a channel. This topology
rule is not a delivery or trapping estimate.

For a mixed parent, connected sub-fields become Concept 2 PASS sources. The
Concept 1 source may represent only the residual parent area after those connected
areas are removed. The weighted merge must close to the parent raster area. A
whole-parent Concept 1 PASS must not be uniformly scaled as a hidden shortcut, and
connected PASS files must not be added to a full-area Concept 1 PASS. If a
defensible residual Concept 1 geometry cannot be generated, the hybrid scheme
fails that parent with explicit manifest provenance.

## Stakeholders

- **Primary / decision owner**: Roger Lew, WEPPpy maintainer.
- **Scientific evaluator**: Mariana Dobre.
- **Implementers**: Codex and WEPPpy/Peridot maintainers.
- **Reviewers**: WEPPpy, Peridot, wepppyo3, frontend, and RQ maintainers.
- **Security Reviewer**: Assigned before route/RQ implementation closes.
- **Informed**: AgFields users and report/output-scope maintainers.

## Success Criteria

- [x] ADR-0019 records the evidence-backed Concept 1 engineering parameters and
  exact hybrid routing rule. It remains Proposed for Roger/Mariana disposition;
  the UI presents the schemes without claiming a scientific default.
- [x] Peridot emits deterministic per-sub-field connectivity details from explicit
  resources while preserving the existing summary CLI contract and test suite.
- [x] Concept 1 produces parseable, internally consistent slope, soil,
  management, hillslope, PASS, watershed, and interchange artifacts from an
  accepted `ofe_plan.parquet`.
- [x] ADR-0019 records an evidence-backed synchronized hillslope capacity; the
  forest include family, release binary, and WEPPpy guard agree exactly.
- [x] Every generated Concept 1 and hybrid management/input tuple parses and runs
  without capacity, invalid-input, floating-point, non-finite, or invalid-producer
  failures; every correction has boundary-appropriate provenance and regression
  evidence.
- [x] Hybrid parents use the documented pure/mixed composition rules, and every
  parent closes its represented source area to the target raster area without
  overlap or omission.
- [x] Ineligible Concept 1 or hybrid parents fail explicitly with stable reason
  codes; no implementation path silently substitutes Concept 2 or rescales a
  whole-parent Concept 1 response.
- [x] The runs page exposes the four exact description-first choices and hydrates
  separate status, staleness, failure, clear, and browse state for every scheme.
- [x] An omitted API scheme runs Concept 2; `all` expands to three serialized jobs
  and returns an additive scheme-to-job-id mapping while preserving the canonical
  RQ response/error envelope.
- [x] Each successful scheme writes only under its fixed root, and clearing one
  scheme cannot delete another scheme, the legacy Concept 2 tree, baseline WEPP,
  or independent AgFields data.
- [x] `sacral-self-discipline` generates all three complete result trees and a
  comparison bundle for Mariana, with protected-tree hashes unchanged.
- [x] Focused and broad Python, Rust, frontend, stub, RQ graph, documentation, and
  security gates pass with no unresolved medium/high security findings.

## Parameterization ADR Gate

- **Parameterization change present**: `yes`
- **ADR required**: `yes`
- **ADR link**:
  [ADR-0019: AgFields Field-Aware OFE and Connectivity-Aware Hybrid Routing](../../adrs/ADR-0019-agfields-field-aware-ofe-hybrid-routing.md)
- **Decision provenance captured**: `yes` for the scheme/classifier, measured
  engineering rules, and synchronized management capacity; production acceptance
  is complete, while scientific/owner disposition remains pending.

The ADR remains Proposed. Engineering evidence establishes a 1-20 OFE planner
limit, exact source representation/positive overlap/area closure gates,
length-preserving residual geometry, and a synchronized hillslope management
capacity of 32. Fit/error measures remain science diagnostics for Mariana rather
than undocumented rejection thresholds. Increasing binary capacity does not
increase the 20-OFE planner limit.
The existing user-visible sub-field minimum-area setting remains the retention
threshold; this package must not introduce a second hidden small-field filter.

## Dependencies

### Prerequisites

- [AgFields Concept 2 Watershed Integration](../20260713_ag_fields_concept2_watershed_integration/package.md),
  including ADR-0018 and the weighted PASS combiner.
- [AgFields Flowpath-to-Channel Connectivity Inventory](../20260713_ag_fields_flowpath_channel_connectivity/package.md),
  including Peridot commit `8343b8f` and the 49.3% dev-project result.
- Existing WEPPpy MOFE slope, soil, management, map, and execution code.
- Current parent WEPP inputs and independent AgFields runs for the designated dev
  project.
- `/workdir/wepp-forest_260430_baseline` source/build/release workflow and its
  numerical ablation protocol. Its unrelated detached dirty baseline is preserved
  and explicitly dispositioned before canonical rebuild or staging.

### Blocks

- Side-by-side scientific comparison of the three AgFields watershed-routing
  schemes.
- Any later decision about which scheme or schemes should be promoted beyond
  experimental labeling.

## Related Packages

- **Depends on**: [AgFields Backend Readiness](../20260709_ag_fields_backend_readiness/package.md)
- **Depends on**: [AgFields Runs-Page UI](../20260709_ag_fields_runs_page_ui/package.md)
- **Related**: [Roads NoDb Inslope E2E](../20260323_roads_nodb_inslope_e2e/package.md)
- **Related evidence**: [AgFields Flowpath-to-Channel Connectivity Inventory](../20260713_ag_fields_flowpath_channel_connectivity/package.md)

## Timeline Estimate

- **Expected duration**: 3-6 focused weeks across Peridot, wepppyo3, WEPPpy,
  frontend, and generated-output evaluation.
- **Complexity**: High.
- **Risk level**: High. Concept 1 fit and mixed-parent residual geometry are the
  main feasibility risks; queue/subprocess/path changes are the main operational
  risks.

## Security Impact and Review Gate

- **Security impact triage**: `high`
- **Dedicated security review required**: `yes`
- **Triage rationale**: The package changes authenticated mutation payloads,
  scheme-selected run-tree writes and deletion, RQ job orchestration, worker
  subprocess execution, NoDb concurrency, and browser-visible artifact links.
- **Security review artifact**:
  [2026-07-14 security review](artifacts/2026-07-14_security_review.md)

## References

- `wepppy/weppcloud/routes/usersum/weppcloud/ag_field-mod.md` - authoritative
  model, UI, and artifact contract.
- `wepppy/nodb/mods/ag_fields/watershed_integration.py` - implemented Concept 2
  parent materialization and watershed rerun.
- `wepppy/nodb/mods/ag_fields/ag_fields.py` - current singular integration facade
  and persisted state to evolve additively.
- `wepppy/microservices/rq_engine/ag_fields_routes.py` and
  `wepppy/rq/ag_fields_rq.py` - authenticated enqueue and worker boundaries.
- `wepppy/nodb/mods/ag_fields/ui_control_layout.md` - runs-page behavioral
  contract.
- `/workdir/peridot/src/subfield_channel_connectivity.rs` - canonical topology
  classifier.
- `/home/workdir/wepppyo3/wepp_interchange/src/mofe.rs` - current slope
  segmentation kernel to extend additively for explicit breakpoints.
- `artifacts/2026-07-14_scheme_artifact_compatibility_plan.md` - required
  compatibility and regression plan.
- `prompts/completed/ag_fields_routing_scheme_suite_execplan.md` - completed
  implementation plan and outcomes.

## Deliverables

Completed engineering substrate and evidence:

- deterministic Peridot connectivity detail for all retained sub-fields;
- read-only Concept 1/hybrid planner and full-project census;
- release-tested explicit-breakpoint wepppyo3 segmentation and WEPPpy wrapper;
- Concept 1 input-synthesis and reference-safe management-deduplication spike;
- real mixed-parent native WEPP and ADR-0018 closure proof; and
- [feasibility evidence and stop decision](artifacts/2026-07-14_concept1_feasibility.md).
- [management capacity/corpus compatibility and validation plan](artifacts/2026-07-14_management_capacity_and_corpus_validation_plan.md).
- [complete capacity, release, and corpus results](artifacts/2026-07-14_management_capacity_corpus_results.md).

The user-facing routing implementation, scheme roots, state, RQ/API
orchestration, UI choices, authenticated all-project generation, comparison
bundle, implementation reviews, and protected-tree verification are complete.
The pre/post inventories contain the same 160,671 files and 39,066,986,682 bytes,
with digest
`2746c0f1667fb9f5b8d7c02d75e42704ae4cac02888c8b17dd2eccc542c5fc59`.

## Follow-up Work

The binary limit is no longer deferred to a separate package. Milestone 2B of the
completed ExecPlan owns inventory, capacity selection, forest changes,
data/numerical failure resolution, release/vendoring, and complete corpus
evidence. Mariana's
scientific evaluation may later produce use constraints, scheme-comparison
metrics, or a promotion/deprecation decision after generated engineering results
exist; none are inferred here.