File: /geodata/weppcloud_runs/portland_LittleSandy_CurCond.202009.cl532_gridmet.chn_cs110/wepp/runs/p104.err

->WEPP hourly water seepage update set (UI code)






  ********************************************************************
  *                                                                  *
  *                                                                  *
  *              USDA - WATER EROSION PREDICTION PROJECT             *
  *                                                                  *
  *                    HILLSLOPE PROFILE - WATERSHED                 *
  *                           EROSION MODEL                          *
  *                                                                  *
  *                    CONTINUOUS SIMULATION AND                     *
  *                       SINGLE STORM OPTIONS                       *
  *                 MAXIMUM WATERSHED CHANNELS: 1000                 *
  *              PHOSPHORUS AND BASEFLOW - JULY 19, 2018             *
  *                                                                  *
  *                          VERSION 2020.500                        *
  *                                                                  *
  *                        May 1,         2020                       *
  *                                                                  *
  *                                                                  *
  *                                                                  *
  ********************************************************************



 Do you wish to output [e]nglish or [m]etric units for
 the average annual summary output file?

 Enter [e] or [m] --> [m]etric default  

 Metric units selected


 Do you wish to drop out of the model upon invalid input and
 write over identical output file names? (batch mode)

 Enter N to run watershed option (not a SHELL option).

 Enter Y or N --> [Y]

 Continuous or single event option
 ---------------------------------
 1 - continuous simulation
 2 - single storm

 Enter option (1 or 2) --> [1]


 Model version option
 --------------------
 1 - hillslope version (single hillslope only)
 2 - hillslope/watershed version
     (multiple hillslopes, channels, and impoundments)
 3 - watershed version (channels and impoundments)
     (option 2 or 3 must be previously selected)

 Enter option (1,2 or 3) --> [1] 

 Do you want hillslope pass file output (Y/N)? [N] --> 

  Enter name of hillslope pass file -->                            

 file name read in: ../output/H104.pass.dat                            

 Soil loss output options for continuous simulation
 ---- ---- ------ ------- --- ---------- ----------
 [1] - Abbreviated annual
  2  - Detailed annual
  3  - Abbreviated event by event
  4  - Detailed event by event
  5  - Monthly
 --------------------------------------------------
 Enter Soil Loss output option [1]


 Do you want initial condition scenario output (Y/N)? [N] --> 

  Enter file name for soil loss output -->                         

 file name read in: ../output/H104.loss.dat                            

 Do you want water balance output (Y/N)? [N] --> 

  Enter file name for water balance output -->                     

 file name read in: ../output/H104.wat.dat                             

 Do you want crop output (Y/N)? [N] --> 

 Do you want soil output (Y/N)? [N] --> 

  Enter file name for soil output -->                              

 file name read in: ../output/H104.soil.dat                            

 Do you want distance and sediment loss output (Y/N)? [N] --> 

  Enter file name for plotting output -->                          

 file name read in: ../output/H104.plot.dat                            

 Do you want large graphics output (Y/N)? [N] --> 

 Do you want event by event output (Y/N)? [N] --> 

  Enter file name for event by event summary -->                   

 file name read in: ../output/H104.ebe.dat                             

 Do you want element output (Y/N)? [N] --> 

  Enter file name for variable OFE line summary -->                

 file name read in: ../output/H104.element.dat                         

 Do you want final summary output (Y/N)? [N] --> 

 Do you want daily winter output (Y/N)? [N] --> 

 Do you want plant yield output (Y/N)? [N] --> 

  Enter name of file containing management data -->                

 file name read in: p104.man                                           
 FAO Penman-Monteith ET Method Implemented
  1.000000000000000E-005  1.000000000000000E-005  0.500000000000000     

  Enter name of file containing slope data -->                     

 file name read in: p104.slp                                           

  Enter name of file containing storm data -->                     

 file name read in: p104.cli                                           

  Enter name of file containing soil data -->                      

 file name read in: p104.sol                                           
 Please enter the irrigation option
 ----------------------------------
 [0] no irrigation
  1  sprinkler, fixed date
  2  sprinkler, depletion level
  3  sprinkler, combination
  4  furrow,    fixed date
  5  furrow,    depletion
  6  furrow,    combination
 -----------------------------------
 Enter irrigation option [0]


 NO IRRIGATION SELECTED.


  Enter number of years to simulate --> 

  To bypass erosion calculations for very small events, enter 1
  Otherwise, to route all events enter 0   (Small events have
  runoff less than 10 mm and peak runoff less than 10 mm/hr) [0] -->

     
 SIMULATION YEAR =           1
 OPERATION ON PLANE           1  ON DAY           2
  7 nov 1980  routing runoff & erosion event on OFE 1 of hillslope    1
  8 nov 1980  routing runoff & erosion event on OFE 1 of hillslope    1
  2 dec 1980  routing runoff & erosion event on OFE 1 of hillslope    1
  3 dec 1980  routing runoff & erosion event on OFE 1 of hillslope    1
 25 dec 1980  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =           2
 OPERATION ON PLANE           1  ON DAY           2
 18 feb 1981  routing runoff & erosion event on OFE 1 of hillslope    1
 11 apr 1981  routing runoff & erosion event on OFE 1 of hillslope    1
  7 jun 1981  routing runoff & erosion event on OFE 1 of hillslope    1
  8 jun 1981  routing runoff & erosion event on OFE 1 of hillslope    1
  5 dec 1981  routing runoff & erosion event on OFE 1 of hillslope    1
  6 dec 1981  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =           3
 OPERATION ON PLANE           1  ON DAY           2
 16 jan 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 17 jan 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 22 jan 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 24 jan 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 25 jan 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 26 jan 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 30 jan 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 31 jan 1982  routing runoff & erosion event on OFE 1 of hillslope    1
  1 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
  2 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 13 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 14 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 15 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 16 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 17 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 18 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 19 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 20 feb 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 13 apr 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 14 apr 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 15 dec 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 16 dec 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 17 dec 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 20 dec 1982  routing runoff & erosion event on OFE 1 of hillslope    1
 21 dec 1982  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =           4
 OPERATION ON PLANE           1  ON DAY           2
  4 jan 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  5 jan 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  6 jan 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  7 jan 1983  routing runoff & erosion event on OFE 1 of hillslope    1
 17 feb 1983  routing runoff & erosion event on OFE 1 of hillslope    1
 18 feb 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  9 mar 1983  routing runoff & erosion event on OFE 1 of hillslope    1
 29 mar 1983  routing runoff & erosion event on OFE 1 of hillslope    1
 30 mar 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  1 apr 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  2 apr 1983  routing runoff & erosion event on OFE 1 of hillslope    1
 24 nov 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  6 dec 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  7 dec 1983  routing runoff & erosion event on OFE 1 of hillslope    1
  9 dec 1983  routing runoff & erosion event on OFE 1 of hillslope    1
 12 dec 1983  routing runoff & erosion event on OFE 1 of hillslope    1
 13 dec 1983  routing runoff & erosion event on OFE 1 of hillslope    1
 14 dec 1983  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =           5
 OPERATION ON PLANE           1  ON DAY           2
  6 jan 1984  routing runoff & erosion event on OFE 1 of hillslope    1
  7 jan 1984  routing runoff & erosion event on OFE 1 of hillslope    1
  9 jan 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 10 jan 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 23 jan 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 24 jan 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 25 jan 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 12 feb 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 13 feb 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 20 mar 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 21 mar 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 25 mar 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 28 mar 1984  routing runoff & erosion event on OFE 1 of hillslope    1
  9 apr 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 10 apr 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 11 apr 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 12 apr 1984  routing runoff & erosion event on OFE 1 of hillslope    1
  2 nov 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 27 nov 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 28 nov 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 29 nov 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 30 nov 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 10 dec 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 12 dec 1984  routing runoff & erosion event on OFE 1 of hillslope    1
 14 dec 1984  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =           6
 OPERATION ON PLANE           1  ON DAY           2
 25 mar 1985  routing runoff & erosion event on OFE 1 of hillslope    1
 26 mar 1985  routing runoff & erosion event on OFE 1 of hillslope    1
  7 jun 1985  routing runoff & erosion event on OFE 1 of hillslope    1
  7 nov 1985  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =           7
 OPERATION ON PLANE           1  ON DAY           2
 22 jan 1986  routing runoff & erosion event on OFE 1 of hillslope    1
 15 feb 1986  routing runoff & erosion event on OFE 1 of hillslope    1
 16 feb 1986  routing runoff & erosion event on OFE 1 of hillslope    1
 22 feb 1986  routing runoff & erosion event on OFE 1 of hillslope    1
 23 feb 1986  routing runoff & erosion event on OFE 1 of hillslope    1
 24 feb 1986  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =           8
 OPERATION ON PLANE           1  ON DAY           2
 31 jan 1987  routing runoff & erosion event on OFE 1 of hillslope    1
  1 feb 1987  routing runoff & erosion event on OFE 1 of hillslope    1
  3 mar 1987  routing runoff & erosion event on OFE 1 of hillslope    1
 13 mar 1987  routing runoff & erosion event on OFE 1 of hillslope    1
  2 dec 1987  routing runoff & erosion event on OFE 1 of hillslope    1
  3 dec 1987  routing runoff & erosion event on OFE 1 of hillslope    1
  9 dec 1987  routing runoff & erosion event on OFE 1 of hillslope    1
 10 dec 1987  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =           9
 OPERATION ON PLANE           1  ON DAY           2
 14 jan 1988  routing runoff & erosion event on OFE 1 of hillslope    1
 24 mar 1988  routing runoff & erosion event on OFE 1 of hillslope    1
 25 mar 1988  routing runoff & erosion event on OFE 1 of hillslope    1
 26 mar 1988  routing runoff & erosion event on OFE 1 of hillslope    1
 29 mar 1988  routing runoff & erosion event on OFE 1 of hillslope    1
  2 apr 1988  routing runoff & erosion event on OFE 1 of hillslope    1
 22 nov 1988  routing runoff & erosion event on OFE 1 of hillslope    1
 23 nov 1988  routing runoff & erosion event on OFE 1 of hillslope    1
 24 nov 1988  routing runoff & erosion event on OFE 1 of hillslope    1
 27 nov 1988  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          10
 OPERATION ON PLANE           1  ON DAY           2
  9 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 10 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 13 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 15 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 16 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 17 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 18 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 19 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 20 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 21 jan 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 19 feb 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 21 feb 1989  routing runoff & erosion event on OFE 1 of hillslope    1
 22 feb 1989  routing runoff & erosion event on OFE 1 of hillslope    1
  5 mar 1989  routing runoff & erosion event on OFE 1 of hillslope    1
  6 mar 1989  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          11
 OPERATION ON PLANE           1  ON DAY           2
  7 jan 1990  routing runoff & erosion event on OFE 1 of hillslope    1
  8 jan 1990  routing runoff & erosion event on OFE 1 of hillslope    1
  9 jan 1990  routing runoff & erosion event on OFE 1 of hillslope    1
  6 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
  7 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
  9 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 10 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 11 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 15 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 22 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 23 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 24 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 25 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 26 feb 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 27 apr 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 29 nov 1990  routing runoff & erosion event on OFE 1 of hillslope    1
  1 dec 1990  routing runoff & erosion event on OFE 1 of hillslope    1
  4 dec 1990  routing runoff & erosion event on OFE 1 of hillslope    1
 10 dec 1990  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          12
 OPERATION ON PLANE           1  ON DAY           2
 11 jan 1991  routing runoff & erosion event on OFE 1 of hillslope    1
 12 jan 1991  routing runoff & erosion event on OFE 1 of hillslope    1
 13 jan 1991  routing runoff & erosion event on OFE 1 of hillslope    1
 14 jan 1991  routing runoff & erosion event on OFE 1 of hillslope    1
 15 jan 1991  routing runoff & erosion event on OFE 1 of hillslope    1
  3 mar 1991  routing runoff & erosion event on OFE 1 of hillslope    1
  8 apr 1991  routing runoff & erosion event on OFE 1 of hillslope    1
  9 apr 1991  routing runoff & erosion event on OFE 1 of hillslope    1
 10 apr 1991  routing runoff & erosion event on OFE 1 of hillslope    1
  6 dec 1991  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          13
 OPERATION ON PLANE           1  ON DAY           2
 19 feb 1992  routing runoff & erosion event on OFE 1 of hillslope    1
 20 feb 1992  routing runoff & erosion event on OFE 1 of hillslope    1
 21 feb 1992  routing runoff & erosion event on OFE 1 of hillslope    1
 21 nov 1992  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          14
 OPERATION ON PLANE           1  ON DAY           2
 28 jan 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 29 jan 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 15 mar 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 16 mar 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 17 mar 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 18 mar 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 21 mar 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 22 mar 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 23 mar 1993  routing runoff & erosion event on OFE 1 of hillslope    1
  2 apr 1993  routing runoff & erosion event on OFE 1 of hillslope    1
  3 apr 1993  routing runoff & erosion event on OFE 1 of hillslope    1
  9 apr 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 10 apr 1993  routing runoff & erosion event on OFE 1 of hillslope    1
 29 apr 1993  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          15
 OPERATION ON PLANE           1  ON DAY           2
  2 jan 1994  routing runoff & erosion event on OFE 1 of hillslope    1
  4 jan 1994  routing runoff & erosion event on OFE 1 of hillslope    1
  5 jan 1994  routing runoff & erosion event on OFE 1 of hillslope    1
 23 feb 1994  routing runoff & erosion event on OFE 1 of hillslope    1
 24 feb 1994  routing runoff & erosion event on OFE 1 of hillslope    1
 27 oct 1994  routing runoff & erosion event on OFE 1 of hillslope    1
 31 oct 1994  routing runoff & erosion event on OFE 1 of hillslope    1
  1 nov 1994  routing runoff & erosion event on OFE 1 of hillslope    1
 17 dec 1994  routing runoff & erosion event on OFE 1 of hillslope    1
 26 dec 1994  routing runoff & erosion event on OFE 1 of hillslope    1
 27 dec 1994  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          16
 OPERATION ON PLANE           1  ON DAY           2
 12 jan 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 13 jan 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 14 jan 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 15 jan 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 31 jan 1995  routing runoff & erosion event on OFE 1 of hillslope    1
  1 feb 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 17 feb 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 18 feb 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 19 feb 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 10 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 11 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 24 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 25 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 26 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 27 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 28 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 29 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 30 nov 1995  routing runoff & erosion event on OFE 1 of hillslope    1
  1 dec 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 10 dec 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 11 dec 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 12 dec 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 13 dec 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 29 dec 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 30 dec 1995  routing runoff & erosion event on OFE 1 of hillslope    1
 31 dec 1995  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          17
 OPERATION ON PLANE           1  ON DAY           2
  7 jan 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 15 jan 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 16 jan 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 18 jan 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 19 jan 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 20 jan 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 23 jan 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 24 jan 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  6 feb 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  7 feb 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  8 feb 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  4 mar 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 22 apr 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 23 apr 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 24 apr 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 25 apr 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 26 apr 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 22 may 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 19 nov 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  1 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  2 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  3 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  4 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  5 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  6 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  7 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
  8 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 10 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 11 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 12 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 13 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 23 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 24 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 25 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 26 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 27 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 28 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 29 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 30 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
 31 dec 1996  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          18
  1 jan 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 OPERATION ON PLANE           1  ON DAY           2
  2 jan 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 30 jan 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 31 jan 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 19 feb 1997  routing runoff & erosion event on OFE 1 of hillslope    1
  7 mar 1997  routing runoff & erosion event on OFE 1 of hillslope    1
  9 mar 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 10 mar 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 11 mar 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 12 mar 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 13 mar 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 15 mar 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 16 mar 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 22 apr 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 23 apr 1997  routing runoff & erosion event on OFE 1 of hillslope    1
 30 oct 1997  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          19
 OPERATION ON PLANE           1  ON DAY           2
 13 jan 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 14 jan 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 16 jan 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 17 jan 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 18 jan 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 23 jan 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 24 jan 1998  routing runoff & erosion event on OFE 1 of hillslope    1
  1 mar 1998  routing runoff & erosion event on OFE 1 of hillslope    1
  2 mar 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 11 dec 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 12 dec 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 26 dec 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 27 dec 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 28 dec 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 29 dec 1998  routing runoff & erosion event on OFE 1 of hillslope    1
 31 dec 1998  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          20
 OPERATION ON PLANE           1  ON DAY           2
 17 jan 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 18 jan 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 19 jan 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 20 jan 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 21 jan 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 22 jan 1999  routing runoff & erosion event on OFE 1 of hillslope    1
  6 feb 1999  routing runoff & erosion event on OFE 1 of hillslope    1
  7 feb 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 18 feb 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 23 feb 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 24 feb 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 27 feb 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 28 feb 1999  routing runoff & erosion event on OFE 1 of hillslope    1
  1 mar 1999  routing runoff & erosion event on OFE 1 of hillslope    1
  2 mar 1999  routing runoff & erosion event on OFE 1 of hillslope    1
  3 mar 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 25 nov 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 26 nov 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 15 dec 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 16 dec 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 17 dec 1999  routing runoff & erosion event on OFE 1 of hillslope    1
 18 dec 1999  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          21
 OPERATION ON PLANE           1  ON DAY           2
  4 jan 2000  routing runoff & erosion event on OFE 1 of hillslope    1
 10 jan 2000  routing runoff & erosion event on OFE 1 of hillslope    1
 11 jan 2000  routing runoff & erosion event on OFE 1 of hillslope    1
 16 jan 2000  routing runoff & erosion event on OFE 1 of hillslope    1
  1 feb 2000  routing runoff & erosion event on OFE 1 of hillslope    1
  2 feb 2000  routing runoff & erosion event on OFE 1 of hillslope    1
 11 may 2000  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          22
 OPERATION ON PLANE           1  ON DAY           2
 30 apr 2001  routing runoff & erosion event on OFE 1 of hillslope    1
  1 dec 2001  routing runoff & erosion event on OFE 1 of hillslope    1
  4 dec 2001  routing runoff & erosion event on OFE 1 of hillslope    1
  5 dec 2001  routing runoff & erosion event on OFE 1 of hillslope    1
  6 dec 2001  routing runoff & erosion event on OFE 1 of hillslope    1
 13 dec 2001  routing runoff & erosion event on OFE 1 of hillslope    1
 14 dec 2001  routing runoff & erosion event on OFE 1 of hillslope    1
 15 dec 2001  routing runoff & erosion event on OFE 1 of hillslope    1
 16 dec 2001  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          23
 OPERATION ON PLANE           1  ON DAY           2
 20 jan 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 21 jan 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 22 jan 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 24 jan 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 25 jan 2002  routing runoff & erosion event on OFE 1 of hillslope    1
  7 feb 2002  routing runoff & erosion event on OFE 1 of hillslope    1
  8 feb 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 11 mar 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 12 mar 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 13 mar 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 19 mar 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 20 mar 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 14 apr 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 15 apr 2002  routing runoff & erosion event on OFE 1 of hillslope    1
 16 apr 2002  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          24
 OPERATION ON PLANE           1  ON DAY           2
 31 jan 2003  routing runoff & erosion event on OFE 1 of hillslope    1
  7 mar 2003  routing runoff & erosion event on OFE 1 of hillslope    1
  8 mar 2003  routing runoff & erosion event on OFE 1 of hillslope    1
  9 mar 2003  routing runoff & erosion event on OFE 1 of hillslope    1
 22 mar 2003  routing runoff & erosion event on OFE 1 of hillslope    1
 26 mar 2003  routing runoff & erosion event on OFE 1 of hillslope    1
 13 dec 2003  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          25
 OPERATION ON PLANE           1  ON DAY           2
 24 jan 2004  routing runoff & erosion event on OFE 1 of hillslope    1
 25 jan 2004  routing runoff & erosion event on OFE 1 of hillslope    1
 28 jan 2004  routing runoff & erosion event on OFE 1 of hillslope    1
 29 jan 2004  routing runoff & erosion event on OFE 1 of hillslope    1
 30 jan 2004  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          26
 OPERATION ON PLANE           1  ON DAY           2
 28 mar 2005  routing runoff & erosion event on OFE 1 of hillslope    1
 29 mar 2005  routing runoff & erosion event on OFE 1 of hillslope    1
  1 nov 2005  routing runoff & erosion event on OFE 1 of hillslope    1
  5 nov 2005  routing runoff & erosion event on OFE 1 of hillslope    1
 28 dec 2005  routing runoff & erosion event on OFE 1 of hillslope    1
 30 dec 2005  routing runoff & erosion event on OFE 1 of hillslope    1
 31 dec 2005  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          27
 OPERATION ON PLANE           1  ON DAY           2
  9 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 10 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 11 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 12 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 13 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 17 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 20 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 29 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 30 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 31 jan 2006  routing runoff & erosion event on OFE 1 of hillslope    1
  1 feb 2006  routing runoff & erosion event on OFE 1 of hillslope    1
  2 feb 2006  routing runoff & erosion event on OFE 1 of hillslope    1
  4 feb 2006  routing runoff & erosion event on OFE 1 of hillslope    1
  5 nov 2006  routing runoff & erosion event on OFE 1 of hillslope    1
  6 nov 2006  routing runoff & erosion event on OFE 1 of hillslope    1
  7 nov 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 14 dec 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 15 dec 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 25 dec 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 26 dec 2006  routing runoff & erosion event on OFE 1 of hillslope    1
 27 dec 2006  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          28
 OPERATION ON PLANE           1  ON DAY           2
  3 jan 2007  routing runoff & erosion event on OFE 1 of hillslope    1
  6 jan 2007  routing runoff & erosion event on OFE 1 of hillslope    1
  7 jan 2007  routing runoff & erosion event on OFE 1 of hillslope    1
 20 feb 2007  routing runoff & erosion event on OFE 1 of hillslope    1
 24 feb 2007  routing runoff & erosion event on OFE 1 of hillslope    1
 25 feb 2007  routing runoff & erosion event on OFE 1 of hillslope    1
  2 mar 2007  routing runoff & erosion event on OFE 1 of hillslope    1
  3 mar 2007  routing runoff & erosion event on OFE 1 of hillslope    1
 20 oct 2007  routing runoff & erosion event on OFE 1 of hillslope    1
 28 dec 2007  routing runoff & erosion event on OFE 1 of hillslope    1
 29 dec 2007  routing runoff & erosion event on OFE 1 of hillslope    1
 30 dec 2007  routing runoff & erosion event on OFE 1 of hillslope    1
 31 dec 2007  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          29
 OPERATION ON PLANE           1  ON DAY           2
  2 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  3 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  4 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  5 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  8 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  9 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 10 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 11 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 12 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 14 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 31 jan 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  1 feb 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  2 feb 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  5 feb 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  6 feb 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  7 feb 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  8 feb 2008  routing runoff & erosion event on OFE 1 of hillslope    1
  9 feb 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 10 feb 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 18 mar 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 12 nov 2008  routing runoff & erosion event on OFE 1 of hillslope    1
 13 nov 2008  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          30
  1 jan 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 OPERATION ON PLANE           1  ON DAY           2
  2 jan 2009  routing runoff & erosion event on OFE 1 of hillslope    1
  7 jan 2009  routing runoff & erosion event on OFE 1 of hillslope    1
  8 jan 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 11 jan 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 12 jan 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 13 jan 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 14 jan 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 15 mar 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 16 mar 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 17 mar 2009  routing runoff & erosion event on OFE 1 of hillslope    1
 28 mar 2009  routing runoff & erosion event on OFE 1 of hillslope    1
  2 apr 2009  routing runoff & erosion event on OFE 1 of hillslope    1
  6 may 2009  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          31
 OPERATION ON PLANE           1  ON DAY           2
 29 mar 2010  routing runoff & erosion event on OFE 1 of hillslope    1
 30 mar 2010  routing runoff & erosion event on OFE 1 of hillslope    1
  2 apr 2010  routing runoff & erosion event on OFE 1 of hillslope    1
  2 jun 2010  routing runoff & erosion event on OFE 1 of hillslope    1
  3 jun 2010  routing runoff & erosion event on OFE 1 of hillslope    1
  4 jun 2010  routing runoff & erosion event on OFE 1 of hillslope    1
  6 jun 2010  routing runoff & erosion event on OFE 1 of hillslope    1
  9 jun 2010  routing runoff & erosion event on OFE 1 of hillslope    1
 10 jun 2010  routing runoff & erosion event on OFE 1 of hillslope    1
 10 dec 2010  routing runoff & erosion event on OFE 1 of hillslope    1
 11 dec 2010  routing runoff & erosion event on OFE 1 of hillslope    1
 12 dec 2010  routing runoff & erosion event on OFE 1 of hillslope    1
 13 dec 2010  routing runoff & erosion event on OFE 1 of hillslope    1
 14 dec 2010  routing runoff & erosion event on OFE 1 of hillslope    1
 28 dec 2010  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          32
 OPERATION ON PLANE           1  ON DAY           2
 13 jan 2011  routing runoff & erosion event on OFE 1 of hillslope    1
 15 jan 2011  routing runoff & erosion event on OFE 1 of hillslope    1
 16 jan 2011  routing runoff & erosion event on OFE 1 of hillslope    1
 18 jan 2011  routing runoff & erosion event on OFE 1 of hillslope    1
  4 mar 2011  routing runoff & erosion event on OFE 1 of hillslope    1
  5 mar 2011  routing runoff & erosion event on OFE 1 of hillslope    1
  8 mar 2011  routing runoff & erosion event on OFE 1 of hillslope    1
  9 mar 2011  routing runoff & erosion event on OFE 1 of hillslope    1
 10 mar 2011  routing runoff & erosion event on OFE 1 of hillslope    1
 16 mar 2011  routing runoff & erosion event on OFE 1 of hillslope    1
  4 apr 2011  routing runoff & erosion event on OFE 1 of hillslope    1
  5 apr 2011  routing runoff & erosion event on OFE 1 of hillslope    1
  6 apr 2011  routing runoff & erosion event on OFE 1 of hillslope    1
 15 apr 2011  routing runoff & erosion event on OFE 1 of hillslope    1
 16 apr 2011  routing runoff & erosion event on OFE 1 of hillslope    1
 30 dec 2011  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          33
 OPERATION ON PLANE           1  ON DAY           2
 19 jan 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 21 jan 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 24 jan 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 30 jan 2012  routing runoff & erosion event on OFE 1 of hillslope    1
  1 feb 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 22 feb 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 13 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 14 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 15 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 16 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 17 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 20 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 21 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 22 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 30 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 31 mar 2012  routing runoff & erosion event on OFE 1 of hillslope    1
  1 apr 2012  routing runoff & erosion event on OFE 1 of hillslope    1
  3 may 2012  routing runoff & erosion event on OFE 1 of hillslope    1
  4 may 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 29 oct 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 20 nov 2012  routing runoff & erosion event on OFE 1 of hillslope    1
 21 nov 2012  routing runoff & erosion event on OFE 1 of hillslope    1
  4 dec 2012  routing runoff & erosion event on OFE 1 of hillslope    1
  5 dec 2012  routing runoff & erosion event on OFE 1 of hillslope    1
  7 dec 2012  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          34
 OPERATION ON PLANE           1  ON DAY           2
 27 jan 2013  routing runoff & erosion event on OFE 1 of hillslope    1
 28 jan 2013  routing runoff & erosion event on OFE 1 of hillslope    1
 29 jan 2013  routing runoff & erosion event on OFE 1 of hillslope    1
 30 jan 2013  routing runoff & erosion event on OFE 1 of hillslope    1
  7 apr 2013  routing runoff & erosion event on OFE 1 of hillslope    1
 29 may 2013  routing runoff & erosion event on OFE 1 of hillslope    1
 30 sep 2013  routing runoff & erosion event on OFE 1 of hillslope    1
  2 dec 2013  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          35
 OPERATION ON PLANE           1  ON DAY           2
 11 feb 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 12 feb 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 14 feb 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 15 feb 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 17 feb 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 18 feb 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 19 feb 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 20 feb 2014  routing runoff & erosion event on OFE 1 of hillslope    1
  5 mar 2014  routing runoff & erosion event on OFE 1 of hillslope    1
  6 mar 2014  routing runoff & erosion event on OFE 1 of hillslope    1
  8 mar 2014  routing runoff & erosion event on OFE 1 of hillslope    1
  9 mar 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 10 mar 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 28 mar 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 29 mar 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 24 apr 2014  routing runoff & erosion event on OFE 1 of hillslope    1
  9 may 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 10 may 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 20 dec 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 21 dec 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 27 dec 2014  routing runoff & erosion event on OFE 1 of hillslope    1
 28 dec 2014  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          36
 OPERATION ON PLANE           1  ON DAY           2
 18 jan 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 31 oct 2015  routing runoff & erosion event on OFE 1 of hillslope    1
  1 nov 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 17 nov 2015  routing runoff & erosion event on OFE 1 of hillslope    1
  7 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
  8 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
  9 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 10 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 12 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 13 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 17 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 18 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 21 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 22 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
 23 dec 2015  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          37
 OPERATION ON PLANE           1  ON DAY           2
 19 jan 2016  routing runoff & erosion event on OFE 1 of hillslope    1
 29 jan 2016  routing runoff & erosion event on OFE 1 of hillslope    1
  4 feb 2016  routing runoff & erosion event on OFE 1 of hillslope    1
 14 mar 2016  routing runoff & erosion event on OFE 1 of hillslope    1
 15 mar 2016  routing runoff & erosion event on OFE 1 of hillslope    1
 15 oct 2016  routing runoff & erosion event on OFE 1 of hillslope    1
  4 dec 2016  routing runoff & erosion event on OFE 1 of hillslope    1
 11 dec 2016  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          38
 OPERATION ON PLANE           1  ON DAY           2
 21 jan 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 22 jan 2017  routing runoff & erosion event on OFE 1 of hillslope    1
  8 feb 2017  routing runoff & erosion event on OFE 1 of hillslope    1
  9 feb 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 10 feb 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 16 feb 2017  routing runoff & erosion event on OFE 1 of hillslope    1
  4 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
  5 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
  6 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
  7 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
  8 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
  9 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 15 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 18 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 24 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 26 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 27 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 29 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 30 mar 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 26 apr 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 16 may 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 21 oct 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 22 oct 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 28 dec 2017  routing runoff & erosion event on OFE 1 of hillslope    1
 29 dec 2017  routing runoff & erosion event on OFE 1 of hillslope    1
     
 SIMULATION YEAR =          39
 OPERATION ON PLANE           1  ON DAY           2
 25 jan 2018  routing runoff & erosion event on OFE 1 of hillslope    1
 27 jan 2018  routing runoff & erosion event on OFE 1 of hillslope    1
 18 feb 2018  routing runoff & erosion event on OFE 1 of hillslope    1
  8 apr 2018  routing runoff & erosion event on OFE 1 of hillslope    1
 12 apr 2018  routing runoff & erosion event on OFE 1 of hillslope    1
 13 apr 2018  routing runoff & erosion event on OFE 1 of hillslope    1
 16 apr 2018  routing runoff & erosion event on OFE 1 of hillslope    1

 Hillslope SUCCESSFUL simulation - returning to DOS


 WEPP COMPLETED HILLSLOPE SIMULATION SUCCESSFULLY
Tip: Press ':' to activate the command bar, type ':help' for help